IAC logo
IAC Assessment: OR0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product CANNED FRUIT & VEGETABLE
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 800
Plant Area (Sq.Ft.) 0
Annual Production 36,845 Tons
Production Hrs. Annual 4,862
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,024 2,934,936 kWh $0.05
Natural Gas $173,903 72,434 MMBtu $2.40
TOTAL ENERGY COSTS $320,927
RECOMMENDED SAVINGS* $13,849 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,845
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$2,582
Cost:
$434
- - - - $2,582 - -
-
kWh
-
-
MMBtu
$2,582
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$797
Cost:
$150
$797 15,826 - - - - $797
15,826
kWh
-
-
MMBtu
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,597
Cost:
-
$3,597 71,805 - - - - $3,597
71,805
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$872
Cost:
$883
$872 17,585 - - - - $872
17,585
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,024
Cost:
$2,931
$1,928 38,687 - - $2,096 - $1,928
38,687
kWh
-
-
MMBtu
$2,096
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$770
Cost:
$1,000
- - $770 321 - - -
-
kWh
$770
321
MMBtu
-
-
$
07: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$1,207
Cost:
$2,980
- - $1,207 503 - - -
-
kWh
$1,207
503
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,849
Cost:
$8,378
$7,194 143,903 $1,977 824 $4,678 - $7,194
143,903
kWh
$1,977
824
MMBtu
$4,678
-
$
TOTAL IMPLEMENTED Savings:
$11,845
Cost:
$5,248
$6,397 128,077 $770 321 $4,678 - $6,397
128,077
kWh
$770
321
MMBtu
$4,678
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes