Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1990
Principal Product FRESH CHICKENS AND FEED
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 8,459,761 Pieces
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $246,085 4,838,218 kWh $0.05
Natural Gas $161,607 43,191 MMBtu $3.74
TOTAL ENERGY COSTS $407,692
RECOMMENDED SAVINGS* $13,825 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,454
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,574
Cost:
$1,000
- - $4,574 1,223 -
-
kWh
$4,574
1,223
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,005
Cost:
$652
$1,005 19,637 - - $1,005
19,637
kWh
-
-
MMBtu
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$655
Cost:
$345
- - $655 175 -
-
kWh
$655
175
MMBtu
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$658
Cost:
$390
- - $658 176 -
-
kWh
$658
176
MMBtu
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,222
Cost:
$3,600
$3,222 77,667 - - $3,222
77,667
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$206
Cost:
$333
- - $206 55 -
-
kWh
$206
55
MMBtu
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$2,585
Cost:
$6,190
$2,585 50,703 - - $2,585
50,703
kWh
-
-
MMBtu
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$434
Cost:
$1,118
- - $434 116 -
-
kWh
$434
116
MMBtu
09: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$486
Cost:
$1,553
- - $486 130 -
-
kWh
$486
130
MMBtu
TOTAL RECOMMENDED Savings:
$13,825
Cost:
$15,181
$6,812 148,007 $7,013 1,875 $6,812
148,007
kWh
$7,013
1,875
MMBtu
TOTAL IMPLEMENTED Savings:
$8,454
Cost:
$8,986
$2,585 50,703 $5,869 1,569 $2,585
50,703
kWh
$5,869
1,569
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas