IAC logo
IAC Assessment: OR0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1990
Principal Product PLYWOOD
NAICS n/a
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 340
Plant Area (Sq.Ft.) 0
Annual Production 168,000 Thousand Feet
Production Hrs. Annual 6,120
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $591,936 22,694,901 kWh $0.03
Wood $1,019,592 640,889 MMBtu $1.59
TOTAL ENERGY COSTS $1,611,528
RECOMMENDED SAVINGS* $94,320 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,529
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$37,102
Cost:
$10,000
$37,102 1,490,621 - - - - $37,102
1,490,621
kWh
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$27,304
Cost:
$21,600
$27,304 - - - - - $27,304
-
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,110
Cost:
$9,180
$4,054 177,608 - - $5,056 - $4,054
177,608
kWh
-
-
MMBtu
$5,056
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,013
Cost:
$2,129
$1,013 41,618 - - - - $1,013
41,618
kWh
-
-
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,133
Cost:
$41,895
- - $10,133 6,373 - - -
-
kWh
$10,133
6,373
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,596
Cost:
$12,900
$3,596 151,231 - - - - $3,596
151,231
kWh
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,062
Cost:
$25,625
$6,062 247,069 - - - - $6,062
247,069
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$94,320
Cost:
$123,329
$79,131 2,108,147 $10,133 6,373 $5,056 - $79,131
2,108,147
kWh
$10,133
6,373
MMBtu
$5,056
-
$
TOTAL IMPLEMENTED Savings:
$74,529
Cost:
$42,909
$69,473 1,709,847 - - $5,056 - $69,473
1,709,847
kWh
-
-
MMBtu
$5,056
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes