IAC logo
IAC Assessment: OR0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product ICE CREAM, FROZEN YOGURT
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 3,000 Thousand Gallons
Production Hrs. Annual 2,625
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,867 2,952,521 kWh $0.03
Natural Gas $25,656 6,499 MMBtu $3.95
TOTAL ENERGY COSTS $117,523
RECOMMENDED SAVINGS* $8,191 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,191
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,529
Cost:
-
- - $1,147 308 $382 - -
-
kWh
$1,147
308
MMBtu
$382
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,640
Cost:
$1,700
$1,640 - - - - - $1,640
-
kWh
-
-
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$76
Cost:
$60
$76 2,052 - - - - $76
2,052
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,626
Cost:
-
$2,310 68,581 - - $1,316 - $2,310
68,581
kWh
-
-
MMBtu
$1,316
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$378
Cost:
$400
$378 12,603 - - - - $378
12,603
kWh
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$361
Cost:
$596
- - $361 97 - - -
-
kWh
$361
97
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$77
Cost:
$37
$77 2,345 - - - - $77
2,345
kWh
-
-
MMBtu
-
-
$
08: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$354
Cost:
-
- - $354 95 - - -
-
kWh
$354
95
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$150
Cost:
$462
$150 4,982 - - - - $150
4,982
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,191
Cost:
$3,255
$4,631 90,563 $1,862 500 $1,698 - $4,631
90,563
kWh
$1,862
500
MMBtu
$1,698
-
$
TOTAL IMPLEMENTED Savings:
$8,191
Cost:
$3,255
$4,631 90,563 $1,862 500 $1,698 - $4,631
90,563
kWh
$1,862
500
MMBtu
$1,698
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes