IAC logo
IAC Assessment: OR0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product MALTED BARLEY
NAICS n/a
SIC 2083 - Malt
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 11,800,000 Pieces
Production Hrs. Annual 8,736
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $835,617 33,943,435 kWh $0.02
Natural Gas $72,536 20,581 MMBtu $3.52
TOTAL ENERGY COSTS $908,153
RECOMMENDED SAVINGS* $61,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,199
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$18,739
Cost:
-
$8,304 422,626 $10,435 - $8,304
422,626
kWh
$10,435
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,392
Cost:
$6,072
$2,392 90,270 - - $2,392
90,270
kWh
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,391
Cost:
$35,042
$12,391 483,001 - - $12,391
483,001
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,743
Cost:
-
$3,798 155,920 $2,945 - $3,798
155,920
kWh
$2,945
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,934
Cost:
$83,040
$20,934 1,065,064 - - $20,934
1,065,064
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$61,199
Cost:
$124,154
$47,819 2,216,881 $13,380 - $47,819
2,216,881
kWh
$13,380
-
$
TOTAL IMPLEMENTED Savings:
$61,199
Cost:
$124,154
$47,819 2,216,881 $13,380 - $47,819
2,216,881
kWh
$13,380
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes