IAC logo
IAC Assessment: OR0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product FROZEN FISH & SEAFOOD
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 17,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,217 1,934,642 kWh $0.08
LPG $28,609 3,318 MMBtu $8.62
TOTAL ENERGY COSTS $191,826
RECOMMENDED SAVINGS* $19,982 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,665
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$736
Cost:
-
$639 12,309 - - $97 - $639
12,309
kWh
-
-
MMBtu
$97
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$317
Cost:
-
- - - - $317 - -
-
kWh
-
-
MMBtu
$317
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$2,074
Cost:
$500
$2,074 39,859 - - - - $2,074
39,859
kWh
-
-
MMBtu
-
-
$
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$2,804
Cost:
$1,727
$126 2,345 - - $2,678 - $126
2,345
kWh
-
-
MMBtu
$2,678
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,538
Cost:
$1,000
- - $1,538 178 - - -
-
kWh
$1,538
178
MMBtu
-
-
$
06: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$6,513
Cost:
$5,744
$6,513 125,147 - - - - $6,513
125,147
kWh
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$878
Cost:
$5,922
$878 13,482 - - - - $878
13,482
kWh
-
-
MMBtu
-
-
$
08: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$1,040
Cost:
$1,200
$1,040 19,930 - - - - $1,040
19,930
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$632
Cost:
$898
$354 4,982 - - $278 - $354
4,982
kWh
-
-
MMBtu
$278
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,450
Cost:
$10,200
$3,450 53,634 - - - - $3,450
53,634
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,982
Cost:
$27,191
$15,074 271,688 $1,538 178 $3,370 - $15,074
271,688
kWh
$1,538
178
MMBtu
$3,370
-
$
TOTAL IMPLEMENTED Savings:
$19,665
Cost:
$27,191
$15,074 271,688 $1,538 178 $3,053 - $15,074
271,688
kWh
$1,538
178
MMBtu
$3,053
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes