IAC logo
IAC Assessment: OR0141
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0141
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product FACTORY LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 0
Annual Production 16,800 Thousand Feet
Production Hrs. Annual 2,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,367 2,337,339 kWh $0.05
Wood $259,896 163,363 MMBtu $1.59
TOTAL ENERGY COSTS $372,263
RECOMMENDED SAVINGS* $103,692 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$40,488
Cost:
$1,000
- - $40,488 25,450 - - -
-
kWh
$40,488
25,450
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$203
Cost:
-
$228 6,155 - - $(-25) - $228
6,155
kWh
-
-
MMBtu
$(-25)
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$303
Cost:
-
$247 6,155 - - $56 - $247
6,155
kWh
-
-
MMBtu
$56
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,158
Cost:
$3,000
$2,158 46,307 - - - - $2,158
46,307
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,600
Cost:
-
$2,065 55,979 - - $535 - $2,065
55,979
kWh
-
-
MMBtu
$535
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,819
Cost:
$4,125
$1,819 - - - - - $1,819
-
kWh
-
-
MMBtu
-
-
$
07: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$54,852
Cost:
$200,000
- - $54,852 34,478 - - -
-
kWh
$54,852
34,478
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,134
Cost:
$5,250
$1,134 26,377 - - - - $1,134
26,377
kWh
-
-
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$135
Cost:
$704
$135 2,052 - - - - $135
2,052
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$103,692
Cost:
$214,079
$7,786 143,025 $95,340 59,928 $566 - $7,786
143,025
kWh
$95,340
59,928
MMBtu
$566
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes