Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1992 |
Principal Product | FACTORY LUMBER |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 16,800 Thousand Feet |
Production Hrs. Annual | 2,080 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $112,367 | 2,337,339 | kWh | $0.05 |
Wood | $259,896 | 163,363 | MMBtu | $1.59 |
TOTAL ENERGY COSTS | $372,263 | |||
RECOMMENDED SAVINGS* | $103,692 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $40,488 Cost: $1,000 |
- | - | $40,488 | 25,450 | - | - |
- - kWh |
$40,488 25,450 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $203 Cost: - |
$228 | 6,155 | - | - | $(-25) | - |
$228 6,155 kWh |
- - MMBtu |
$(-25) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $303 Cost: - |
$247 | 6,155 | - | - | $56 | - |
$247 6,155 kWh |
- - MMBtu |
$56 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,158 Cost: $3,000 |
$2,158 | 46,307 | - | - | - | - |
$2,158 46,307 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,600 Cost: - |
$2,065 | 55,979 | - | - | $535 | - |
$2,065 55,979 kWh |
- - MMBtu |
$535 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,819 Cost: $4,125 |
$1,819 | - | - | - | - | - |
$1,819 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM |
Savings: $54,852 Cost: $200,000 |
- | - | $54,852 | 34,478 | - | - |
- - kWh |
$54,852 34,478 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,134 Cost: $5,250 |
$1,134 | 26,377 | - | - | - | - |
$1,134 26,377 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $135 Cost: $704 |
$135 | 2,052 | - | - | - | - |
$135 2,052 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $103,692 Cost: $214,079 |
$7,786 | 143,025 | $95,340 | 59,928 | $566 | - | $7,786 143,025 kWh |
$95,340 59,928 MMBtu |
$566 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes |