IAC Assessment: OR0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product GREEN LUMBER AND VENEER
NAICS n/a
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 475
Plant Area (Sq.Ft.) 0
Annual Production 74 Thousand Feet
Production Hrs. Annual 6,100
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $804,301 19,191,384 kWh $0.04
TOTAL ENERGY COSTS $804,301
RECOMMENDED SAVINGS* $59,262 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,166
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$769
Cost:
-
$603 20,223 - - $166 - $603
20,223
kWh
-
-
MMBtu
$166
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,013
Cost:
-
$721 24,033 - - $292 - $721
24,033
kWh
-
-
MMBtu
$292
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,683
Cost:
$13,500
$17,683 - - - - - $17,683
-
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$33,362
Cost:
$45,000
$33,362 634,818 - - - - $33,362
634,818
kWh
-
-
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,432
Cost:
$8,712
- - $4,432 5,083 - - -
-
kWh
$4,432
5,083
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$619
Cost:
$1,452
$619 11,723 - - - - $619
11,723
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,191
Cost:
-
$1,568 42,204 - - $(-377) - $1,568
42,204
kWh
-
-
MMBtu
$(-377)
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$193
Cost:
-
$276 5,862 - - $(-83) - $276
5,862
kWh
-
-
MMBtu
$(-83)
-
$
TOTAL RECOMMENDED Savings:
$59,262
Cost:
$68,664
$54,832 738,863 $4,432 5,083 $(-2) - $54,832
738,863
kWh
$4,432
5,083
MMBtu
$(-2)
-
$
TOTAL IMPLEMENTED Savings:
$3,166
Cost:
-
$3,168 92,322 - - $(-2) - $3,168
92,322
kWh
-
-
MMBtu
$(-2)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes