IAC logo
IAC Assessment: OR0146
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0146
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product RANDOM WIDTH HARDWOOD
NAICS n/a
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $5,000,000-$10,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $217,434 7,423,798 kWh $0.03
Natural Gas $248,996 82,977 MMBtu $3.00
TOTAL ENERGY COSTS $466,430
RECOMMENDED SAVINGS* $20,742 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,026
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$645
Cost:
-
$423 20,809 - - $222 - $423
20,809
kWh
-
-
MMBtu
$222
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,041
Cost:
-
$1,041 33,705 - - - - $1,041
33,705
kWh
-
-
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,813
Cost:
$885
$1,603 54,220 - - $210 - $1,603
54,220
kWh
-
-
MMBtu
$210
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$440
Cost:
$500
$440 17,585 - - - - $440
17,585
kWh
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$636
Cost:
$1,000
- - $636 793 - - -
-
kWh
$636
793
MMBtu
-
-
$
06: 2.2123 INSULATE FEEDWATER TANK Savings:
$157
Cost:
$333
- - $157 196 - - -
-
kWh
$157
196
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,119
Cost:
$5,950
$2,119 86,460 - - - - $2,119
86,460
kWh
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$536
Cost:
$8,869
$536 17,878 - - - - $536
17,878
kWh
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,355
Cost:
$66,726
$13,355 656,506 - - - - $13,355
656,506
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$20,742
Cost:
$84,263
$19,517 887,163 $793 989 $432 - $19,517
887,163
kWh
$793
989
MMBtu
$432
-
$
TOTAL IMPLEMENTED Savings:
$4,026
Cost:
$10,754
$3,180 105,803 $636 793 $210 - $3,180
105,803
kWh
$636
793
MMBtu
$210
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes