Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1992 |
Principal Product | PINE LUMBER |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 42,000 Thousand Feet |
Production Hrs. Annual | 8,568 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $392,756 | 8,445,487 | kWh | $0.05 |
Wood | $500,885 | 463,000 | MMBtu | $1.08 |
TOTAL ENERGY COSTS | $893,641 | |||
RECOMMENDED SAVINGS* | $84,563 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $80,755 |
#|Description |
Savings Cost |
Status | Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $62,000 Cost: $1,000 |
- | - | $62,000 | 57,000 | - | - |
- - kWh |
$62,000 57,000 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,144 Cost: - |
$9,144 | 247,069 | - | - | - | - |
$9,144 247,069 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $4,699 Cost: - |
$3,619 | 109,613 | - | - | $1,080 | - |
$3,619 109,613 kWh |
- - MMBtu |
$1,080 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,826 Cost: - |
$3,982 | 90,563 | - | - | $(-156) | - |
$3,982 90,563 kWh |
- - MMBtu |
$(-156) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,086 Cost: $2,240 |
$1,086 | 23,740 | - | - | - | - |
$1,086 23,740 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,808 Cost: $7,200 |
$3,808 | 86,166 | - | - | - | - |
$3,808 86,166 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $84,563 Cost: $10,440 |
$21,639 | 557,151 | $62,000 | 57,000 | $924 | - | $21,639 557,151 kWh |
$62,000 57,000 MMBtu |
$924 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $80,755 Cost: $3,240 |
$17,831 | 470,985 | $62,000 | 57,000 | $924 | - | $17,831 470,985 kWh |
$62,000 57,000 MMBtu |
$924 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes |