IAC Assessment: OR0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product DOUGLAS FIR LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 31,200 Thousand Feet
Production Hrs. Annual 4,437
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,917 3,121,043 kWh $0.05
TOTAL ENERGY COSTS $150,917
RECOMMENDED SAVINGS* $1,038,772 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,036,912
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$850
Cost:
$1,500
$850 17,878 - - $850
17,878
kWh
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,022,395
Cost:
$250,000
$4,495 83,529 $1,017,900 - $4,495
83,529
kWh
$1,017,900
-
$
03: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$387
Cost:
$237
$282 6,448 $105 - $282
6,448
kWh
$105
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,017
Cost:
$1,244
$1,074 24,912 $(-57) - $1,074
24,912
kWh
$(-57)
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$623
Cost:
-
$623 11,723 - - $623
11,723
kWh
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$306
Cost:
$1,270
$306 6,155 - - $306
6,155
kWh
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,194
Cost:
$10,500
$13,194 - - - $13,194
-
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$1,038,772
Cost:
$264,751
$20,824 150,645 $1,017,948 - $20,824
150,645
kWh
$1,017,948
-
$
TOTAL IMPLEMENTED Savings:
$1,036,912
Cost:
$263,014
$19,069 114,596 $1,017,843 - $19,069
114,596
kWh
$1,017,843
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes