IAC Assessment: OR0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1993
Principal Product Dimensional Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 10,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,319 1,322,392 kWh $0.05
Wood $35,055 27,421 MMBtu $1.28
TOTAL ENERGY COSTS $97,374
RECOMMENDED SAVINGS* $24,831 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$6,498
Cost:
$1,000
- - $6,498 5,466 - - -
-
kWh
$6,498
5,466
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,670
Cost:
$4,500
$4,670 - - - - - $4,670
-
kWh
-
-
MMBtu
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$612
Cost:
$1,230
$612 24,619 - - - - $612
24,619
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,897
Cost:
$5,062
$1,897 33,411 - - - - $1,897
33,411
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$370
Cost:
$1,036
$393 7,913 - - $(-23) - $393
7,913
kWh
-
-
MMBtu
$(-23)
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$354
Cost:
$1,000
$354 2,931 - - - - $354
2,931
kWh
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,092
Cost:
$3,525
$1,092 26,377 - - - - $1,092
26,377
kWh
-
-
MMBtu
-
-
$
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$9,338
Cost:
$41,360
$9,338 373,681 - - - - $9,338
373,681
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,831
Cost:
$58,713
$18,356 468,932 $6,498 5,466 $(-23) - $18,356
468,932
kWh
$6,498
5,466
MMBtu
$(-23)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes