IAC Assessment: OR0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1993
Principal Product Veneer
NAICS n/a
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 80,000
Annual Production 52,000,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,243 5,075,029 kWh $0.03
Wood $76,300 47,960 MMBtu $1.59
TOTAL ENERGY COSTS $247,543
RECOMMENDED SAVINGS* $29,247 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,764
#|Description Savings
Cost
Status Electricity Usage Other Energy Personnel Changes Electricity Usage Other Energy Personnel Changes
$ kWh $ MMBtu $ $
01: 2.2514 COVER OPEN TANKS Savings:
$3,192
Cost:
$1,900
- - $3,192 1,505 - - -
-
kWh
$3,192
1,505
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,353
Cost:
$10,000
$11,353 312,134 - - - - $11,353
312,134
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$590
Cost:
$3,210
$590 19,637 - - - - $590
19,637
kWh
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,034
Cost:
$7,500
$9,034 - - - - - $9,034
-
kWh
-
-
MMBtu
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,483
Cost:
-
$3,415 189,625 - - $1,068 - $3,415
189,625
kWh
-
-
MMBtu
$1,068
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$595
Cost:
$1,752
$433 18,464 - - $162 - $433
18,464
kWh
-
-
MMBtu
$162
-
$
TOTAL RECOMMENDED Savings:
$29,247
Cost:
$24,362
$24,825 539,860 $3,192 1,505 $1,230 - $24,825
539,860
kWh
$3,192
1,505
MMBtu
$1,230
-
$
TOTAL IMPLEMENTED Savings:
$24,764
Cost:
$24,362
$21,410 350,235 $3,192 1,505 $162 - $21,410
350,235
kWh
$3,192
1,505
MMBtu
$162
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Other Energy Personnel Changes Electricity Usage Other Energy Personnel Changes