Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1993 |
Principal Product | Veneer |
NAICS | n/a |
SIC | 2436 - Softwood Veneer And Plywood |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 52,000,000 Thousand Feet |
Production Hrs. Annual | 4,000 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $171,243 | 5,075,029 | kWh | $0.03 |
Wood | $76,300 | 47,960 | MMBtu | $1.59 |
TOTAL ENERGY COSTS | $247,543 | |||
RECOMMENDED SAVINGS* | $29,247 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,764 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Energy | Personnel Changes | Electricity Usage | Other Energy | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2514 COVER OPEN TANKS |
Savings: $3,192 Cost: $1,900 |
- | - | $3,192 | 1,505 | - | - |
- - kWh |
$3,192 1,505 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,353 Cost: $10,000 |
$11,353 | 312,134 | - | - | - | - |
$11,353 312,134 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $590 Cost: $3,210 |
$590 | 19,637 | - | - | - | - |
$590 19,637 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $9,034 Cost: $7,500 |
$9,034 | - | - | - | - | - |
$9,034 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $4,483 Cost: - |
$3,415 | 189,625 | - | - | $1,068 | - |
$3,415 189,625 kWh |
- - MMBtu |
$1,068 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $595 Cost: $1,752 |
$433 | 18,464 | - | - | $162 | - |
$433 18,464 kWh |
- - MMBtu |
$162 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,247 Cost: $24,362 |
$24,825 | 539,860 | $3,192 | 1,505 | $1,230 | - | $24,825 539,860 kWh |
$3,192 1,505 MMBtu |
$1,230 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,764 Cost: $24,362 |
$21,410 | 350,235 | $3,192 | 1,505 | $162 | - | $21,410 350,235 kWh |
$3,192 1,505 MMBtu |
$162 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Energy | Personnel Changes | Electricity Usage | Other Energy | Personnel Changes |