IAC logo
IAC Assessment: OR0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1994
Principal Product Phenolic Resins
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 23
Plant Area (Sq.Ft.) 0
Annual Production 120 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,129 4,067,995 kWh $0.05
Natural Gas $99,568 35,829 MMBtu $2.78
TOTAL ENERGY COSTS $284,697
RECOMMENDED SAVINGS* $76,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,918
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$4,250
Cost:
$1,000
- - $4,250 1,518 - - -
-
kWh
$4,250
1,518
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,050
Cost:
$2,746
- - $2,050 732 - - -
-
kWh
$2,050
732
MMBtu
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$5,147
Cost:
$1,105
$5,147 109,613 - - - - $5,147
109,613
kWh
-
-
MMBtu
-
-
$
04: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$42,700
Cost:
$3,000
$42,700 - - - - - $42,700
-
kWh
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,675
Cost:
$600
$1,675 67,116 - - - - $1,675
67,116
kWh
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$373
Cost:
$825
$373 8,792 - - - - $373
8,792
kWh
-
-
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,297
Cost:
$4,400
$4,297 - - - - - $4,297
-
kWh
-
-
MMBtu
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$16,148
Cost:
$43,000
- - - - $16,148 - -
-
kWh
-
-
MMBtu
$16,148
-
$
TOTAL RECOMMENDED Savings:
$76,640
Cost:
$56,676
$54,192 185,521 $6,300 2,250 $16,148 - $54,192
185,521
kWh
$6,300
2,250
MMBtu
$16,148
-
$
TOTAL IMPLEMENTED Savings:
$25,918
Cost:
$45,930
$5,520 118,405 $4,250 1,518 $16,148 - $5,520
118,405
kWh
$4,250
1,518
MMBtu
$16,148
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes