IAC logo
IAC Assessment: OR0217
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0217
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1994
Principal Product Band & Circular Saws, Knives
NAICS n/a
SIC 3553 - Woodworking Machinery
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 4,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,383 4,645,662 kWh $0.05
Natural Gas $20,231 4,497 MMBtu $4.50
TOTAL ENERGY COSTS $249,614
RECOMMENDED SAVINGS* $19,884 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,365
#|Description Savings
Cost
Status Electricity Usage Wood Water Disposal Electricity Usage Wood Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,943
Cost:
$5,465
$2,943 68,288 - - - - $2,943
68,288
kWh
-
-
MMBtu
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,072
Cost:
$15,891
$4,072 84,408 - - - - $4,072
84,408
kWh
-
-
MMBtu
-
-
Tgal
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$1,880
Cost:
$3,200
- - - - $1,880 1,710 -
-
kWh
-
-
MMBtu
$1,880
1,710
Tgal
04: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$8,519
Cost:
$20,000
- - - - $8,519 17,500 -
-
kWh
-
-
MMBtu
$8,519
17,500
Tgal
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,470
Cost:
-
- - $2,470 - - - -
-
kWh
$2,470
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$19,884
Cost:
$44,556
$7,015 152,696 $2,470 - $10,399 19,210 $7,015
152,696
kWh
$2,470
-
MMBtu
$10,399
19,210
Tgal
TOTAL IMPLEMENTED Savings:
$11,365
Cost:
$24,556
$7,015 152,696 $2,470 - $1,880 1,710 $7,015
152,696
kWh
$2,470
-
MMBtu
$1,880
1,710
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Wood Water Disposal Electricity Usage Wood Water Disposal