IAC logo
IAC Assessment: OR0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1994
Principal Product Electronic Capacitors
NAICS n/a
SIC 3675 - Electronic Capacitors
Sales $10,000,000-$50,000,000
# of Employees 640
Plant Area (Sq.Ft.) 84,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 8,736
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $398,371 14,713,365 kWh $0.03
TOTAL ENERGY COSTS $398,371
RECOMMENDED SAVINGS* $50,545 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,482
#|Description Savings
Cost
Status Electricity Usage Water Disposal Solid Waste (haz) Electricity Usage Water Disposal Solid Waste (haz)
$ kWh $ Tgal $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,336
Cost:
$2,262
$1,336 44,256 - - - - $1,336
44,256
kWh
-
-
Tgal
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$503
Cost:
$4,100
$503 21,395 - - - - $503
21,395
kWh
-
-
Tgal
-
-
lb
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,770
Cost:
$10,000
$7,770 - - - - - $7,770
-
kWh
-
-
Tgal
-
-
lb
04: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$4,938
Cost:
$8,847
$4,938 208,382 - - - - $4,938
208,382
kWh
-
-
Tgal
-
-
lb
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$28,438
Cost:
$35,000
- - - - $28,438 729,500 -
-
kWh
-
-
Tgal
$28,438
729,500
lb
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$7,560
Cost:
$38,847
- - $7,560 54,000 - - -
-
kWh
$7,560
54,000
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$50,545
Cost:
$99,056
$14,547 274,033 $7,560 54,000 $28,438 729,500 $14,547
274,033
kWh
$7,560
54,000
Tgal
$28,438
729,500
lb
TOTAL IMPLEMENTED Savings:
$42,482
Cost:
$56,109
$14,044 252,638 - - $28,438 729,500 $14,044
252,638
kWh
-
-
Tgal
$28,438
729,500
lb
Savings
Cost
$ kWh $ Tgal $ lb
Electricity Usage Water Disposal Solid Waste (haz) Electricity Usage Water Disposal Solid Waste (haz)