IAC logo
IAC Assessment: OR0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1994
Principal Product Cabinets
NAICS n/a
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 250,000
Annual Production 136,000 Pieces
Production Hrs. Annual 6,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,572 3,621,337 kWh $0.04
Natural Gas $94,474 21,293 MMBtu $4.44
TOTAL ENERGY COSTS $287,026
RECOMMENDED SAVINGS* $47,092 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,728
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,968
Cost:
$5,768
- - $1,968 408 - - -
-
kWh
$1,968
408
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,407
Cost:
$4,000
$4,407 111,958 - - - - $4,407
111,958
kWh
-
-
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$558
Cost:
$1,345
$558 14,361 - - - - $558
14,361
kWh
-
-
MMBtu
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,364
Cost:
$4,800
$1,364 34,584 - - - - $1,364
34,584
kWh
-
-
MMBtu
-
-
lb
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$695
Cost:
$2,000
$695 - - - - - $695
-
kWh
-
-
MMBtu
-
-
lb
06: 2.5125 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE Savings:
$23,850
Cost:
$106,600
$13,310 338,511 $10,540 2,374 - - $13,310
338,511
kWh
$10,540
2,374
MMBtu
-
-
lb
07: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$14,250
Cost:
$6,500
- - - - $14,250 - -
-
kWh
-
-
MMBtu
$14,250
-
lb
TOTAL RECOMMENDED Savings:
$47,092
Cost:
$131,013
$20,334 499,414 $12,508 2,782 $14,250 - $20,334
499,414
kWh
$12,508
2,782
MMBtu
$14,250
-
lb
TOTAL IMPLEMENTED Savings:
$45,728
Cost:
$126,213
$18,970 464,830 $12,508 2,782 $14,250 - $18,970
464,830
kWh
$12,508
2,782
MMBtu
$14,250
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)