IAC logo
IAC Assessment: OR0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product Galvanized Metals
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 45,000
Annual Production 18,321,000 Pounds
Production Hrs. Annual 6,257
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,028 6,105,803 kWh $0.03
Natural Gas $24,264 4,662 MMBtu $5.20
TOTAL ENERGY COSTS $281,073
RECOMMENDED SAVINGS* $82,967 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,373
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (haz) Electricity Usage Natural Gas Solid Waste (haz)
$ kWh $ MMBtu $ lb
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,955
Cost:
$445
$1,955 51,876 - - - - $1,955
51,876
kWh
-
-
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,010
Cost:
$2,000
$1,010 32,825 - - - - $1,010
32,825
kWh
-
-
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$85
Cost:
$269
$85 2,345 - - - - $85
2,345
kWh
-
-
MMBtu
-
-
lb
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$37,639
Cost:
$13,819
$78,482 2,234,467 $(-40,843) (-7,622) - - $78,482
2,234,467
kWh
$(-40,843)
(-7,622)
MMBtu
-
-
lb
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$42,278
Cost:
$66,500
$3,468 115,475 - - $38,810 135,000 $3,468
115,475
kWh
-
-
MMBtu
$38,810
135,000
lb
TOTAL RECOMMENDED Savings:
$82,967
Cost:
$83,033
$85,000 2,436,988 $(-40,843) (-7,622) $38,810 135,000 $85,000
2,436,988
kWh
$(-40,843)
(-7,622)
MMBtu
$38,810
135,000
lb
TOTAL IMPLEMENTED Savings:
$43,373
Cost:
$68,769
$4,563 150,645 - - $38,810 135,000 $4,563
150,645
kWh
-
-
MMBtu
$38,810
135,000
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (haz) Electricity Usage Natural Gas Solid Waste (haz)