Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1995 |
Principal Product | Carbonated Beverages |
NAICS | n/a |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 450,000,000 Pounds |
Production Hrs. Annual | 6,018 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $184,155 | 5,053,634 | kWh | $0.04 |
Natural Gas | $68,629 | 14,008 | MMBtu | $4.90 |
TOTAL ENERGY COSTS | $371,150 | |||
RECOMMENDED SAVINGS* | $41,299 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,043 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $4,425 Cost: $300 |
- | - | - | - | $4,425 | 885 | - | - |
- - kWh |
- - MMBtu |
$4,425 885 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $18,578 Cost: $4,500 |
$18,578 | 625,733 | - | - | - | - | - | - |
$18,578 625,733 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $12,318 Cost: $17,000 |
$(-2,080) | (-69,168) | $14,398 | 3,724 | - | - | - | - |
$(-2,080) (-69,168) kWh |
$14,398 3,724 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,311 Cost: $138 |
$1,292 | 39,273 | - | - | - | - | $19 | - |
$1,292 39,273 kWh |
- - MMBtu |
- - gal |
$19 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,043 Cost: $11,076 |
$3,043 | 84,115 | - | - | - | - | - | - |
$3,043 84,115 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,624 Cost: $5,100 |
$1,624 | - | - | - | - | - | - | - |
$1,624 - kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $41,299 Cost: $38,114 |
$22,457 | 679,953 | $14,398 | 3,724 | $4,425 | 885 | $19 | - | $22,457 679,953 kWh |
$14,398 3,724 MMBtu |
$4,425 885 gal |
$19 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,043 Cost: $11,076 |
$3,043 | 84,115 | - | - | - | - | - | - | $3,043 84,115 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes |