IAC Assessment: OR0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product Injection Molded Plastics
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 60,000
Annual Production 600,000 Pounds
Production Hrs. Annual 6,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,910 2,515,240 kWh $0.03
Electricity Demand $11,531 7,188 kW-months/year $1.60
Electricity Fees $2,946 - $ -
Natural Gas $5,919 1,122 MMBtu $5.28
TOTAL ENERGY COSTS $121,334
RECOMMENDED SAVINGS* $12,551 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,512
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,446
Cost:
$560
- - - - - - - - $2,446 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,446
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,920
Cost:
$1,190
- - - - - - $1,920 412 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,920
412
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,860
Cost:
$2,290
$1,860 62,720 - - - - - - - - $1,860
62,720
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$830
Cost:
$2,626
$730 24,619 $100 60 - - - - - - $730
24,619
kWh
$100
60
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,259
Cost:
$6,400
- - - - $2,259 - - - - - -
-
kWh
-
-
kW-months/year
$2,259
-
$
-
-
MMBtu
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,660
Cost:
$16,440
$2,660 89,390 - - - - - - - - $2,660
89,390
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$576
Cost:
$6,630
$518 17,292 $58 35 - - - - - - $518
17,292
kWh
$58
35
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,551
Cost:
$36,136
$5,768 194,021 $158 95 $2,259 - $1,920 412 $2,446 - $5,768
194,021
kWh
$158
95
kW-months/year
$2,259
-
$
$1,920
412
MMBtu
$2,446
-
$
TOTAL IMPLEMENTED Savings:
$6,512
Cost:
$26,256
$3,908 131,301 $158 95 - - - - $2,446 - $3,908
131,301
kWh
$158
95
kW-months/year
-
-
$
-
-
MMBtu
$2,446
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes