IAC logo
IAC Assessment: OR0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product anodized aircraft components
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 30,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 4,992
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,725 1,632,181 kWh $0.03
Electricity Demand $7,721 4,691 kW-months/year $1.65
Natural Gas $19,387 3,647 MMBtu $5.32
TOTAL ENERGY COSTS $135,009
RECOMMENDED SAVINGS* $14,299 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,962
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS Savings:
$7,505
Cost:
-
- - - - $682 3,544 - - $3,953 - $2,870 - -
-
kWh
-
-
kW-months/year
$682
3,544
lb
-
-
$
$3,953
-
$
$2,870
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$584
Cost:
-
$584 19,637 - - - - - - - - - - $584
19,637
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,599
Cost:
$1,436
$1,599 53,927 - - - - - - - - - - $1,599
53,927
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$663
Cost:
$1,454
$581 19,637 $82 49 - - - - - - - - $581
19,637
kWh
$82
49
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,337
Cost:
$11,047
$1,199 40,445 $92 55 - - $108 - $938 - - - $1,199
40,445
kWh
$92
55
kW-months/year
-
-
lb
$108
-
$
$938
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,611
Cost:
-
$921 31,067 $34 20 - - $71 - $585 - - - $921
31,067
kWh
$34
20
kW-months/year
-
-
lb
$71
-
$
$585
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$14,299
Cost:
$13,937
$4,884 164,713 $208 124 $682 3,544 $179 - $5,476 - $2,870 - $4,884
164,713
kWh
$208
124
kW-months/year
$682
3,544
lb
$179
-
$
$5,476
-
$
$2,870
-
$
TOTAL IMPLEMENTED Savings:
$11,962
Cost:
$2,890
$3,685 124,268 $116 69 $682 3,544 $71 - $4,538 - $2,870 - $3,685
124,268
kWh
$116
69
kW-months/year
$682
3,544
lb
$71
-
$
$4,538
-
$
$2,870
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost