IAC Assessment: OR0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product anodized aluminum truck parts
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 400
Plant Area (Sq.Ft.) 85,000
Annual Production 10,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $291,669 9,038,687 kWh $0.03
Electricity Demand $56,842 22,920 kW-months/year $2.48
Electricity Fees $3,547 - $ -
TOTAL ENERGY COSTS $352,058
RECOMMENDED SAVINGS* $153,794 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,336
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ $ $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$61,134
Cost:
$20,900
$(-440) (-13,482) $(-96) (-32) - - - - $35,300 1,661,500 $26,370 - - - $(-440)
(-13,482)
kWh
$(-96)
(-32)
kW-months/year
-
-
$
-
-
Tgal
$35,300
1,661,500
lb
$26,370
-
$
-
-
$
02: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$69,830
Cost:
$183,000
$(-7,760) (-236,811) $(-1,410) (-473) - - $84,000 19,820,000 - - - - $(-5,000) - $(-7,760)
(-236,811)
kWh
$(-1,410)
(-473)
kW-months/year
-
-
$
$84,000
19,820,000
Tgal
-
-
lb
-
-
$
$(-5,000)
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$14,343
Cost:
$15,100
$14,343 437,573 - - - - - - - - - - - - $14,343
437,573
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,202
Cost:
$7,023
$3,687 112,544 $515 173 - - - - - - - - - - $3,687
112,544
kWh
$515
173
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,319
Cost:
$9,400
- - - - $3,319 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,319
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$966
Cost:
$3,352
$1,178 36,049 $147 48 - - - - - - $21 - $(-380) - $1,178
36,049
kWh
$147
48
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
$21
-
$
$(-380)
-
$
TOTAL RECOMMENDED Savings:
$153,794
Cost:
$238,775
$11,008 335,873 $(-844) (-284) $3,319 - $84,000 19,820,000 $35,300 1,661,500 $26,391 - $(-5,380) - $11,008
335,873
kWh
$(-844)
(-284)
kW-months/year
$3,319
-
$
$84,000
19,820,000
Tgal
$35,300
1,661,500
lb
$26,391
-
$
$(-5,380)
-
$
TOTAL IMPLEMENTED Savings:
$65,336
Cost:
$27,923
$3,247 99,062 $419 141 - - - - $35,300 1,661,500 $26,370 - - - $3,247
99,062
kWh
$419
141
kW-months/year
-
-
$
-
-
Tgal
$35,300
1,661,500
lb
$26,370
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost