Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1996 |
Principal Product | anodized aluminum truck parts |
NAICS | n/a |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 10,500,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $291,669 | 9,038,687 | kWh | $0.03 |
Electricity Demand | $56,842 | 22,920 | kW-months/year | $2.48 |
Electricity Fees | $3,547 | - | $ | - |
TOTAL ENERGY COSTS | $352,058 | |||
RECOMMENDED SAVINGS* | $153,794 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $65,336 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $61,134 Cost: $20,900 |
$(-440) | (-13,482) | $(-96) | (-32) | - | - | - | - | $35,300 | 1,661,500 | $26,370 | - | - | - |
$(-440) (-13,482) kWh |
$(-96) (-32) kW-months/year |
- - $ |
- - Tgal |
$35,300 1,661,500 lb |
$26,370 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER |
Savings: $69,830 Cost: $183,000 |
$(-7,760) | (-236,811) | $(-1,410) | (-473) | - | - | $84,000 | 19,820,000 | - | - | - | - | $(-5,000) | - |
$(-7,760) (-236,811) kWh |
$(-1,410) (-473) kW-months/year |
- - $ |
$84,000 19,820,000 Tgal |
- - lb |
- - $ |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $14,343 Cost: $15,100 |
$14,343 | 437,573 | - | - | - | - | - | - | - | - | - | - | - | - |
$14,343 437,573 kWh |
- - kW-months/year |
- - $ |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,202 Cost: $7,023 |
$3,687 | 112,544 | $515 | 173 | - | - | - | - | - | - | - | - | - | - |
$3,687 112,544 kWh |
$515 173 kW-months/year |
- - $ |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,319 Cost: $9,400 |
- | - | - | - | $3,319 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,319 - $ |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $966 Cost: $3,352 |
$1,178 | 36,049 | $147 | 48 | - | - | - | - | - | - | $21 | - | $(-380) | - |
$1,178 36,049 kWh |
$147 48 kW-months/year |
- - $ |
- - Tgal |
- - lb |
$21 - $ |
$(-380) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $153,794 Cost: $238,775 |
$11,008 | 335,873 | $(-844) | (-284) | $3,319 | - | $84,000 | 19,820,000 | $35,300 | 1,661,500 | $26,391 | - | $(-5,380) | - | $11,008 335,873 kWh |
$(-844) (-284) kW-months/year |
$3,319 - $ |
$84,000 19,820,000 Tgal |
$35,300 1,661,500 lb |
$26,391 - $ |
$(-5,380) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $65,336 Cost: $27,923 |
$3,247 | 99,062 | $419 | 141 | - | - | - | - | $35,300 | 1,661,500 | $26,370 | - | - | - | $3,247 99,062 kWh |
$419 141 kW-months/year |
- - $ |
- - Tgal |
$35,300 1,661,500 lb |
$26,370 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |