Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1996 |
Principal Product | Treated Railroad Ties |
NAICS | n/a |
SIC | 2491 - Wood Preserving |
Sales | $10,000,000-$50,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 3,500,000 |
Annual Production | 3,505,832 Thousand Feet |
Production Hrs. Annual | 8,760 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $62,509 | 2,179,953 | kWh | $0.03 |
Electricity Demand | $16,613 | 8,868 | kW-months/year | $1.87 |
Natural Gas | $118,144 | 48,915 | MMBtu | $2.42 |
TOTAL ENERGY COSTS | $281,427 | |||
RECOMMENDED SAVINGS* | $17,426 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,532 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $3,761 Cost: - |
- | - | - | - | - | - | $12,017 | 1,457,599 | $(-7,680) | - | $(-576) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$12,017 1,457,599 lb |
$(-7,680) - $ |
$(-576) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $9,894 Cost: $500 |
- | - | - | - | $9,894 | 4,088 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,894 4,088 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,493 Cost: $5,000 |
$2,610 | 128,664 | $883 | 221 | - | - | - | - | - | - | - | - |
$2,610 128,664 kWh |
$883 221 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $278 Cost: $1,091 |
$188 | 9,379 | $90 | 22 | - | - | - | - | - | - | - | - |
$188 9,379 kWh |
$90 22 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,426 Cost: $6,591 |
$2,798 | 138,043 | $973 | 243 | $9,894 | 4,088 | $12,017 | 1,457,599 | $(-7,680) | - | $(-576) | - | $2,798 138,043 kWh |
$973 243 kW-months/year |
$9,894 4,088 MMBtu |
$12,017 1,457,599 lb |
$(-7,680) - $ |
$(-576) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,532 Cost: $6,091 |
$2,798 | 138,043 | $973 | 243 | - | - | $12,017 | 1,457,599 | $(-7,680) | - | $(-576) | - | $2,798 138,043 kWh |
$973 243 kW-months/year |
- - MMBtu |
$12,017 1,457,599 lb |
$(-7,680) - $ |
$(-576) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |