IAC Assessment: OR0275
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0275
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product Treated Railroad Ties
NAICS n/a
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 3,500,000
Annual Production 3,505,832 Thousand Feet
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,509 2,179,953 kWh $0.03
Electricity Demand $16,613 8,868 kW-months/year $1.87
Natural Gas $118,144 48,915 MMBtu $2.42
TOTAL ENERGY COSTS $281,427
RECOMMENDED SAVINGS* $17,426 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,532
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$3,761
Cost:
-
- - - - - - $12,017 1,457,599 $(-7,680) - $(-576) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,017
1,457,599
lb
$(-7,680)
-
$
$(-576)
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,894
Cost:
$500
- - - - $9,894 4,088 - - - - - - -
-
kWh
-
-
kW-months/year
$9,894
4,088
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,493
Cost:
$5,000
$2,610 128,664 $883 221 - - - - - - - - $2,610
128,664
kWh
$883
221
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$278
Cost:
$1,091
$188 9,379 $90 22 - - - - - - - - $188
9,379
kWh
$90
22
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$17,426
Cost:
$6,591
$2,798 138,043 $973 243 $9,894 4,088 $12,017 1,457,599 $(-7,680) - $(-576) - $2,798
138,043
kWh
$973
243
kW-months/year
$9,894
4,088
MMBtu
$12,017
1,457,599
lb
$(-7,680)
-
$
$(-576)
-
$
TOTAL IMPLEMENTED Savings:
$7,532
Cost:
$6,091
$2,798 138,043 $973 243 - - $12,017 1,457,599 $(-7,680) - $(-576) - $2,798
138,043
kWh
$973
243
kW-months/year
-
-
MMBtu
$12,017
1,457,599
lb
$(-7,680)
-
$
$(-576)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes