IAC logo
IAC Assessment: OR0284
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0284
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product maraschino cherries
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 10,000
Annual Production 6,759,452 Pounds
Production Hrs. Annual 5,950
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,336 857,562 kWh $0.03
Electricity Demand $10,511 2,676 kW-months/year $3.93
Natural Gas $72,360 19,497 MMBtu $3.71
TOTAL ENERGY COSTS $141,952
RECOMMENDED SAVINGS* $36,759 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,589
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$35,224
Cost:
$10,450
$(-20) (-879) $(-36) (-9) - - $20,400 796,000 $14,880 - $(-20)
(-879)
kWh
$(-36)
(-9)
kW-months/year
-
-
MMBtu
$20,400
796,000
lb
$14,880
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,074
Cost:
$516
- - - - $1,074 280 - - - - -
-
kWh
-
-
kW-months/year
$1,074
280
MMBtu
-
-
lb
-
-
$
03: 2.2123 INSULATE FEEDWATER TANK Savings:
$291
Cost:
$155
- - - - $291 76 - - - - -
-
kWh
-
-
kW-months/year
$291
76
MMBtu
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$170
Cost:
$804
$97 4,689 $73 18 - - - - - - $97
4,689
kWh
$73
18
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$36,759
Cost:
$11,925
$77 3,810 $37 9 $1,365 356 $20,400 796,000 $14,880 - $77
3,810
kWh
$37
9
kW-months/year
$1,365
356
MMBtu
$20,400
796,000
lb
$14,880
-
$
TOTAL IMPLEMENTED Savings:
$36,589
Cost:
$11,121
$(-20) (-879) $(-36) (-9) $1,365 356 $20,400 796,000 $14,880 - $(-20)
(-879)
kWh
$(-36)
(-9)
kW-months/year
$1,365
356
MMBtu
$20,400
796,000
lb
$14,880
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes