IAC Assessment: OR0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1996
Principal Product Brine and Fresh Pack Cherries
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 30,000
Annual Production 12,805,150 Pounds
Production Hrs. Annual 4,800
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,269 5,162,368 kWh $0.02
Electricity Demand $43,648 11,796 kW-months/year $3.70
Electricity Fees $205 - $ -
Natural Gas $45,066 9,539 MMBtu $4.72
TOTAL ENERGY COSTS $248,127
RECOMMENDED SAVINGS* $79,450 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $76,949
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ Tgal
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$33,432
Cost:
-
- - - - - 6,270,000 $29,400 - $4,032 - - - - - -
-
kWh
-
-
kW-months/year
-
6,270,000
lb
$29,400
-
$
$4,032
-
$
-
-
$
-
-
Tgal
02: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$464
Cost:
$142
- - - - - - - - - - - - $464 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
$464
-
Tgal
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$36,382
Cost:
$10,450
$(-19) (-879) $(-34) (-9) $22,755 740,000 $13,680 - - - - - - - $(-19)
(-879)
kWh
$(-34)
(-9)
kW-months/year
$22,755
740,000
lb
$13,680
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,815
Cost:
-
$1,815 89,390 - - - - - - - - - - - - $1,815
89,390
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,671
Cost:
$15,663
$1,705 84,115 $671 179 - - $3,124 - - - $1,171 - - - $1,705
84,115
kWh
$671
179
kW-months/year
-
-
lb
$3,124
-
$
-
-
$
$1,171
-
$
-
-
Tgal
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$686
Cost:
$2,582
$454 22,274 $232 62 - - - - - - - - - - $454
22,274
kWh
$232
62
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$79,450
Cost:
$28,837
$3,955 194,900 $869 232 $22,755 7,010,000 $46,204 - $4,032 - $1,171 - $464 - $3,955
194,900
kWh
$869
232
kW-months/year
$22,755
7,010,000
lb
$46,204
-
$
$4,032
-
$
$1,171
-
$
$464
-
Tgal
TOTAL IMPLEMENTED Savings:
$76,949
Cost:
$26,255
$1,686 83,236 $637 170 $22,755 7,010,000 $46,204 - $4,032 - $1,171 - $464 - $1,686
83,236
kWh
$637
170
kW-months/year
$22,755
7,010,000
lb
$46,204
-
$
$4,032
-
$
$1,171
-
$
$464
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption