IAC logo
IAC Assessment: OR0294
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0294
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1997
Principal Product Asphalt Roofing Sheet
NAICS n/a
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 35,000
Annual Production 604,332 Pieces
Production Hrs. Annual 4,320
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,753 802,755 kWh $0.03
Electricity Demand $10,018 2,772 kW-months/year $3.61
Electricity Fees $1,942 - $ -
Natural Gas $64,019 18,087 MMBtu $3.54
LPG $5,970 459 MMBtu $13.01
TOTAL ENERGY COSTS $192,730
RECOMMENDED SAVINGS* $157,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,323
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ lb $ $ $ $ $ $ $ $
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,710
Cost:
$500
$1,290 38,980 - - - - - - - - - - - - $70 - - - - - $350 - $1,290
38,980
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
$70
-
$
-
-
$
-
-
$
$350
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,320
Cost:
$500
- - - - - - $1,320 409 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,320
409
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,520
Cost:
$1,000
$1,520 45,721 - - - - - - - - - - - - - - - - - - - - $1,520
45,721
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,540
Cost:
$3,700
$1,540 46,307 - - - - - - - - - - - - - - - - - - - - $1,540
46,307
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$861
Cost:
$2,600
- - - - $861 - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$861
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,133
Cost:
$3,516
$804 24,326 $329 91 - - - - - - - - - - - - - - - - - - $804
24,326
kWh
$329
91
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$8,920
Cost:
$80,000
- - - - - - $8,920 2,759 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,920
2,759
MMBtu
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$9,140
Cost:
$80,000
$(-410) (-12,309) $(-250) (-68) - - - - $100 7 - - - - $9,700 - - - - - - - $(-410)
(-12,309)
kWh
$(-250)
(-68)
kW-months/year
-
-
$
-
-
MMBtu
$100
7
MMBtu
-
-
lb
-
-
lb
$9,700
-
$
-
-
$
-
-
$
-
-
$
09: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$117,450
Cost:
$206,000
$(-4,000) (-120,164) - - - - - - - - $(-38,300) (-450,000) - - - - $(-10,250) - $170,000 - - - $(-4,000)
(-120,164)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$(-38,300)
(-450,000)
lb
-
-
lb
-
-
$
$(-10,250)
-
$
$170,000
-
$
-
-
$
10: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$11,700
Cost:
$22,500
- - - - - - - - $200 16 - - - - $11,500 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$200
16
MMBtu
-
-
lb
-
-
lb
$11,500
-
$
-
-
$
-
-
$
-
-
$
11: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,160
Cost:
-
- - - - - - - - - - - - $2,200 190 - - - - - - $(-40) - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
$2,200
190
lb
-
-
$
-
-
$
-
-
$
$(-40)
-
$
TOTAL RECOMMENDED Savings:
$157,454
Cost:
$400,316
$744 22,861 $79 23 $861 - $10,240 3,168 $300 23 $(-38,300) (-450,000) $2,200 190 $21,270 - $(-10,250) - $170,000 - $310 - $744
22,861
kWh
$79
23
kW-months/year
$861
-
$
$10,240
3,168
MMBtu
$300
23
MMBtu
$(-38,300)
(-450,000)
lb
$2,200
190
lb
$21,270
-
$
$(-10,250)
-
$
$170,000
-
$
$310
-
$
TOTAL IMPLEMENTED Savings:
$6,323
Cost:
$4,516
$2,094 63,306 $329 91 - - $1,320 409 - - - - $2,200 190 $70 - - - - - $310 - $2,094
63,306
kWh
$329
91
kW-months/year
-
-
$
$1,320
409
MMBtu
-
-
MMBtu
-
-
lb
$2,200
190
lb
$70
-
$
-
-
$
-
-
$
$310
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost