IAC logo
IAC Assessment: OR0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1997
Principal Product Milk, Ice Cream, Cottage Cheese
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 85,236
Annual Production 164,989,620 Pounds
Production Hrs. Annual 3,536
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $360,454 10,989,156 kWh $0.03
Electricity Demand $91,660 515,124 kW-months/year $0.18
Electricity Fees $27,638 - $ -
Natural Gas $72,106 26,581 MMBtu $2.71
TOTAL ENERGY COSTS $678,222
RECOMMENDED SAVINGS* $432,773 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $148,901
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $
01: 3.4151 MINIMIZE WATER USAGE Savings:
$277,700
Cost:
$336,500
$(-10,900) (-332,943) $(-6,400) (-1,464) - - - - $295,000 - - 732,000 - - - - $(-10,900)
(-332,943)
kWh
$(-6,400)
(-1,464)
kW-months/year
-
-
$
-
-
MMBtu
$295,000
-
Tgal
-
732,000
lb
-
-
$
-
-
$
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,215
Cost:
-
- - - - - - - - - - $2,215 29,614 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$2,215
29,614
lb
-
-
$
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,880
Cost:
-
- - - - - - - - - - $1,880 26,520 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$1,880
26,520
lb
-
-
$
-
-
$
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,275
Cost:
-
- - - - - - - - - - $1,275 10,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$1,275
10,000
lb
-
-
$
-
-
$
05: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$34,550
Cost:
$24,000
$42,550 1,297,186 - - - - - - - - - - - - $(-8,000) - $42,550
1,297,186
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$(-8,000)
-
$
06: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$5,800
Cost:
-
$5,800 177,022 - - - - - - - - - - - - - - $5,800
177,022
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$24,530
Cost:
$7,000
$24,530 747,948 - - - - - - - - - - - - - - $24,530
747,948
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,751
Cost:
$20,994
$6,566 200,176 $2,185 502 - - - - - - - - - - - - $6,566
200,176
kWh
$2,185
502
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
09: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$6,850
Cost:
$4,200
- - - - - - $6,850 2,793 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,850
2,793
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,682
Cost:
$18,000
- - - - $2,682 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,682
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
11: 4.3110 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$4,240
Cost:
-
- - - - - - - - - - - - $4,240 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$4,240
-
$
-
-
$
12: 4.3110 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$62,300
Cost:
$51,600
$(-125) (-3,810) $(-220) (-48) - - - - - - - - $62,645 - - - $(-125)
(-3,810)
kWh
$(-220)
(-48)
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$62,645
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$432,773
Cost:
$462,294
$68,421 2,085,579 $(-4,435) (-1,010) $2,682 - $6,850 2,793 $295,000 - $5,370 798,134 $66,885 - $(-8,000) - $68,421
2,085,579
kWh
$(-4,435)
(-1,010)
kW-months/year
$2,682
-
$
$6,850
2,793
MMBtu
$295,000
-
Tgal
$5,370
798,134
lb
$66,885
-
$
$(-8,000)
-
$
TOTAL IMPLEMENTED Savings:
$148,901
Cost:
$107,794
$79,321 2,418,522 $1,965 454 - - $6,850 2,793 - - $1,880 26,520 $66,885 - $(-8,000) - $79,321
2,418,522
kWh
$1,965
454
kW-months/year
-
-
$
$6,850
2,793
MMBtu
-
-
Tgal
$1,880
26,520
lb
$66,885
-
$
$(-8,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost