IAC logo
IAC Assessment: OR0321
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0321
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Recycled Aluminum
NAICS n/a
SIC 3341 - Secondary Nonferrous Metals
Sales $10,000,000-$50,000,000
# of Employees 24
Plant Area (Sq.Ft.) 0
Annual Production 38,131,000 Pounds
Production Hrs. Annual 3,680
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,449 5,047,186 kWh $0.03
Electricity Demand $47,774 178,044 kW-months/year $0.27
Electricity Fees $(-2,746) - $ -
Natural Gas $387,729 123,328 MMBtu $3.14
LPG $23,654 2,322 MMBtu $10.19
TOTAL ENERGY COSTS $632,923
RECOMMENDED SAVINGS* $91,581 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$60,872
Cost:
$1,851
- - - - $60,872 24,700 - - - - - - -
-
kWh
-
-
kW-months/year
$60,872
24,700
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$8,820
Cost:
-
- - - - $8,820 3,580 - - - - - - -
-
kWh
-
-
kW-months/year
$8,820
3,580
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$16,110
Cost:
$138,600
$(-570) (-17,292) $(-1,220) (-378) $(-5,700) (-2,316) $23,600 2,322 - - - - $(-570)
(-17,292)
kWh
$(-1,220)
(-378)
kW-months/year
$(-5,700)
(-2,316)
MMBtu
$23,600
2,322
MMBtu
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,189
Cost:
-
$2,452 74,736 - - - - - - $61 - $676 - $2,452
74,736
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$61
-
$
$676
-
$
05: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$2,590
Cost:
$15,000
- - - - $40 18 - - $2,550 - - - -
-
kWh
-
-
kW-months/year
$40
18
MMBtu
-
-
MMBtu
$2,550
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,581
Cost:
$155,451
$1,882 57,444 $(-1,220) (-378) $64,032 25,982 $23,600 2,322 $2,611 - $676 - $1,882
57,444
kWh
$(-1,220)
(-378)
kW-months/year
$64,032
25,982
MMBtu
$23,600
2,322
MMBtu
$2,611
-
$
$676
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost