IAC Assessment: OR0382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Fruit Puree
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 20,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 6,336
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $234,087 6,798,652 kWh $0.03
Electricity Demand $61,881 219,840 kW-months/year $0.28
Electricity Fees $21,219 - $ -
Natural Gas $1,099,542 283,484 MMBtu $3.88
TOTAL ENERGY COSTS $1,556,319
RECOMMENDED SAVINGS* $118,745 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $110,260
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $ $ $ $ $
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$26,817
Cost:
$900
- - - - - - $26,817 6,914 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$26,817
6,914
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$15,208
Cost:
$26,491
$12,024 349,355 $3,184 942 - - - - - - - - - - - - - - $12,024
349,355
kWh
$3,184
942
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,194
Cost:
$2,979
$1,810 52,462 $244 72 - - - - - - - - - - $2,140 - - - $1,810
52,462
kWh
$244
72
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
$2,140
-
$
-
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$2,050
Cost:
$4,653
$2,050 59,496 - - - - - - - - - - - - - - - - $2,050
59,496
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,241
Cost:
$6,400
- - - - $2,241 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,241
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.1181 ELIMINATE A BY-PRODUCT Savings:
$68,235
Cost:
$2,000
- - - - - - - - $(-2,345) (-231) $3,180 2,016,000 $(-12,600) - - - $80,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-2,345)
(-231)
MMBtu
$3,180
2,016,000
lb
$(-12,600)
-
$
-
-
$
$80,000
-
$
TOTAL RECOMMENDED Savings:
$118,745
Cost:
$43,423
$15,884 461,313 $3,428 1,014 $2,241 - $26,817 6,914 $(-2,345) (-231) $3,180 2,016,000 $(-12,600) - $2,140 - $80,000 - $15,884
461,313
kWh
$3,428
1,014
kW-months/year
$2,241
-
$
$26,817
6,914
MMBtu
$(-2,345)
(-231)
MMBtu
$3,180
2,016,000
lb
$(-12,600)
-
$
$2,140
-
$
$80,000
-
$
TOTAL IMPLEMENTED Savings:
$110,260
Cost:
$29,391
$12,024 349,355 $3,184 942 - - $26,817 6,914 $(-2,345) (-231) $3,180 2,016,000 $(-12,600) - - - $80,000 - $12,024
349,355
kWh
$3,184
942
kW-months/year
-
-
$
$26,817
6,914
MMBtu
$(-2,345)
(-231)
MMBtu
$3,180
2,016,000
lb
$(-12,600)
-
$
-
-
$
$80,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product