Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2002 |
Principal Product | Precision Machine Parts |
NAICS | n/a |
SIC | 3451 - Screw Machine Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 47,000 |
Annual Production | 40,000,000 Pieces |
Production Hrs. Annual | 4,200 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $109,607 | 1,862,800 | kWh | $0.06 |
Electricity Demand | $30,352 | 6,240 | kW-months/year | $4.86 |
Electricity Fees | $1,339 | - | $ | - |
Natural Gas | $15,190 | 1,618 | MMBtu | $9.39 |
TOTAL ENERGY COSTS | $156,488 | |||
RECOMMENDED SAVINGS* | $26,930 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,897 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,115 Cost: $33,646 |
$9,869 | 167,736 | $2,306 | 468 | $(-452) | - | $2,392 | - |
$9,869 167,736 kWh |
$2,306 468 kW-months/year |
$(-452) - $ |
$2,392 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,918 Cost: $3,031 |
$2,081 | 35,359 | $486 | 98 | $(-34) | - | $385 | - |
$2,081 35,359 kWh |
$486 98 kW-months/year |
$(-34) - $ |
$385 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,676 Cost: $560 |
$3,775 | 64,152 | $901 | 182 | - | - | - | - |
$3,775 64,152 kWh |
$901 182 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,472 Cost: $3,500 |
$2,547 | 43,293 | $925 | 187 | - | - | - | - |
$2,547 43,293 kWh |
$925 187 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,749 Cost: - |
$1,239 | 21,051 | $510 | 103 | - | - | - | - |
$1,239 21,051 kWh |
$510 103 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,930 Cost: $40,737 |
$19,511 | 331,591 | $5,128 | 1,038 | $(-486) | - | $2,777 | - | $19,511 331,591 kWh |
$5,128 1,038 kW-months/year |
$(-486) - $ |
$2,777 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,897 Cost: $4,060 |
$7,561 | 128,496 | $2,336 | 472 | - | - | - | - | $7,561 128,496 kWh |
$2,336 472 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost |