IAC Assessment: OR0411
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0411
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product Hops pellets
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 14,200,000 Pounds
Production Hrs. Annual 3,400
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,166 4,700,017 kWh $0.04
Electricity Demand $47,434 15,108 kW-months/year $3.14
Electricity Fees $12,316 - $ -
TOTAL ENERGY COSTS $244,916
RECOMMENDED SAVINGS* $40,183 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,683
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$20,500
Cost:
$66,000
$20,500 610,100 - - - - - - $20,500
610,100
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,050
Cost:
$25,951
$7,519 223,326 $531 160 - - - - $7,519
223,326
kWh
$531
160
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,510
Cost:
$4,500
$3,470 33,823 $1,040 202 - - - - $3,470
33,823
kWh
$1,040
202
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,377
Cost:
$6,300
$3,746 95,057 $1,035 312 $102 - $494 - $3,746
95,057
kWh
$1,035
312
kW-months/year
$102
-
$
$494
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,746
Cost:
-
$1,275 37,861 $471 142 - - - - $1,275
37,861
kWh
$471
142
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,183
Cost:
$102,751
$36,510 1,000,167 $3,077 816 $102 - $494 - $36,510
1,000,167
kWh
$3,077
816
kW-months/year
$102
-
$
$494
-
$
TOTAL IMPLEMENTED Savings:
$19,683
Cost:
$36,751
$16,010 390,067 $3,077 816 $102 - $494 - $16,010
390,067
kWh
$3,077
816
kW-months/year
$102
-
$
$494
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost