IAC logo
IAC Assessment: OR0424
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0424
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product 2
NAICS n/a
SIC 1041 - Gold Ores
Sales $100,000,000-$500,000,000
# of Employees 1,462
Plant Area (Sq.Ft.) 0
Annual Production 0 Pounds
Production Hrs. Annual 8,565
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,414,720 353,469,361 kWh $0.05
Electricity Demand $216,146 518,750 kW-months/year $0.42
Electricity Fees $6,000 - $ -
Natural Gas $2,151,480 778,171 MMBtu $2.76
LPG $3,377,411 594,294 MMBtu $5.68
TOTAL ENERGY COSTS $23,165,757
RECOMMENDED SAVINGS* $1,957,209 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,131
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1117 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION Savings:
$577,590
Cost:
$207,147
- - - - $577,590 154,024 -
-
kWh
-
-
kW-months/year
$577,590
154,024
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$958,574
Cost:
$1,727,000
$819,644 16,234,542 $138,930 27,792 - - $819,644
16,234,542
kWh
$138,930
27,792
kW-months/year
-
-
MMBtu
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$158,150
Cost:
$118,500
- - - - $158,150 42,175 -
-
kWh
-
-
kW-months/year
$158,150
42,175
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$119,700
Cost:
$241,870
$104,000 2,105,788 $15,700 3,144 - - $104,000
2,105,788
kWh
$15,700
3,144
kW-months/year
-
-
MMBtu
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$69,350
Cost:
$46,000
$60,810 1,246,590 $8,540 1,708 - - $60,810
1,246,590
kWh
$8,540
1,708
kW-months/year
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$25,349
Cost:
-
$22,029 446,197 $3,320 664 - - $22,029
446,197
kWh
$3,320
664
kW-months/year
-
-
MMBtu
07: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$20,311
Cost:
$1,000
- - - - $20,311 5,582 -
-
kWh
-
-
kW-months/year
$20,311
5,582
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,470
Cost:
$12,200
$12,190 260,250 $1,280 256 - - $12,190
260,250
kWh
$1,280
256
kW-months/year
-
-
MMBtu
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$14,715
Cost:
$45,000
- - - - $14,715 3,924 -
-
kWh
-
-
kW-months/year
$14,715
3,924
MMBtu
TOTAL RECOMMENDED Savings:
$1,957,209
Cost:
$2,398,717
$1,018,673 20,293,367 $167,770 33,564 $770,766 205,705 $1,018,673
20,293,367
kWh
$167,770
33,564
kW-months/year
$770,766
205,705
MMBtu
TOTAL IMPLEMENTED Savings:
$103,131
Cost:
$59,200
$73,000 1,506,840 $9,820 1,964 $20,311 5,582 $73,000
1,506,840
kWh
$9,820
1,964
kW-months/year
$20,311
5,582
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas