IAC logo
IAC Assessment: OR0429
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0429
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Piping and Fittings
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 0
Annual Production 4,436,430 Units
Production Hrs. Annual 2,040
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,855 1,864,880 kWh $0.03
Electricity Demand $37,928 10,977 kW-months/year $3.46
Electricity Fees $5,677 - $ -
Natural Gas $62,333 9,586 MMBtu $6.50
TOTAL ENERGY COSTS $189,210
RECOMMENDED SAVINGS* $23,264 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
01: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$13,080
Cost:
$43,350
- - - - - - - - $13,080 1,480 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$13,080
1,480
gal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,040
Cost:
$7,490
$2,250 58,300 $1,790 342 - - - - - - $2,250
58,300
kWh
$1,790
342
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,380
Cost:
$2,400
$1,450 37,689 $930 178 - - - - - - $1,450
37,689
kWh
$930
178
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
04: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$2,230
Cost:
$4,750
$2,090 54,256 $140 314 - - - - - - $2,090
54,256
kWh
$140
314
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,025
Cost:
$150
- - - - - - $1,025 158 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,025
158
MMBtu
-
-
gal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$509
Cost:
$1,800
$163 4,208 $207 40 $139 - - - - - $163
4,208
kWh
$207
40
kW-months/year
$139
-
$
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$23,264
Cost:
$59,940
$5,953 154,453 $3,067 874 $139 - $1,025 158 $13,080 1,480 $5,953
154,453
kWh
$3,067
874
kW-months/year
$139
-
$
$1,025
158
MMBtu
$13,080
1,480
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz)