IAC Assessment: OR0431
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0431
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Asphalt shingle coatings
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $1,000,000-$5,000,000
# of Employees 14
Plant Area (Sq.Ft.) 0
Annual Production 157,334 Tons
Production Hrs. Annual 8,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,860 3,703,945 kWh $0.04
Electricity Demand $60,501 148,128 kW-months/year $0.41
Electricity Fees $2,947 - $ -
Natural Gas $765,236 167,370 MMBtu $4.57
TOTAL ENERGY COSTS $983,544
RECOMMENDED SAVINGS* $34,862 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,830
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$7,341
Cost:
$1,900
$5,592 129,210 $1,749 354 - - $5,592
129,210
kWh
$1,749
354
kW-months/year
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$17,830
Cost:
$54,571
$15,200 351,530 $2,630 528 - - $15,200
351,530
kWh
$2,630
528
kW-months/year
-
-
MMBtu
03: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$5,590
Cost:
$4,000
- - - - $5,590 1,224 -
-
kWh
-
-
kW-months/year
$5,590
1,224
MMBtu
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$2,860
Cost:
$5,500
- - - - $2,860 650 -
-
kWh
-
-
kW-months/year
$2,860
650
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,241
Cost:
$7,250
$1,061 24,513 $180 36 - - $1,061
24,513
kWh
$180
36
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$34,862
Cost:
$73,221
$21,853 505,253 $4,559 918 $8,450 1,874 $21,853
505,253
kWh
$4,559
918
kW-months/year
$8,450
1,874
MMBtu
TOTAL IMPLEMENTED Savings:
$17,830
Cost:
$54,571
$15,200 351,530 $2,630 528 - - $15,200
351,530
kWh
$2,630
528
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas