IAC logo
IAC Assessment: OR0432
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0432
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $100,000,000-$500,000,000
# of Employees 800
Plant Area (Sq.Ft.) 0
Annual Production 12 Thousand Feet
Production Hrs. Annual 8,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $891,633 32,013,072 kWh $0.03
Electricity Demand $321,275 54,138 kW-months/year $5.93
Electricity Fees $525 - $ -
Natural Gas $341,058 58,189 MMBtu $5.86
TOTAL ENERGY COSTS $1,705,591
RECOMMENDED SAVINGS* $191,773 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,960
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 3.5144 RECYCLE SPENT TANNING SOLUTION Savings:
$136,000
Cost:
$280,000
- - - - - - $63,000 74,000 $73,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$63,000
74,000
gal
$73,000
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$25,900
Cost:
$32,000
$17,500 629,000 $8,400 1,380 - - - - - - $17,500
629,000
kWh
$8,400
1,380
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,830
Cost:
$1,200
- - - - $10,830 1,905 - - - - -
-
kWh
-
-
kW-months/year
$10,830
1,905
MMBtu
-
-
gal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,230
Cost:
$7,640
$4,590 164,720 $5,640 936 - - - - - - $4,590
164,720
kWh
$5,640
936
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,813
Cost:
$8,813
- - $8,813 400 - - - - - - -
-
kWh
$8,813
400
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$191,773
Cost:
$329,653
$22,090 793,720 $22,853 2,716 $10,830 1,905 $63,000 74,000 $73,000 - $22,090
793,720
kWh
$22,853
2,716
kW-months/year
$10,830
1,905
MMBtu
$63,000
74,000
gal
$73,000
-
$
TOTAL IMPLEMENTED Savings:
$46,960
Cost:
$40,840
$22,090 793,720 $14,040 2,316 $10,830 1,905 - - - - $22,090
793,720
kWh
$14,040
2,316
kW-months/year
$10,830
1,905
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes