IAC logo
IAC Assessment: OR0433
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0433
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product green dimensional lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 40,000
Annual Production 17,524,500 Units
Production Hrs. Annual 1,960
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,202 1,481,000 kWh $0.04
Electricity Demand $54,965 10,410 kW-months/year $5.28
Electricity Fees $5,136 - $ -
TOTAL ENERGY COSTS $122,303
RECOMMENDED SAVINGS* $220,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $132,250
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Primary Product Electricity Usage Electricity Demand Primary Raw Material Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$117,000
Cost:
$150,300
- - - - $117,000 - - - -
-
kWh
-
-
kW-months/year
$117,000
-
$
-
-
$
02: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$78,000
Cost:
$62,900
- - - - - - $78,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$78,000
-
$
03: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$9,500
Cost:
-
- - $9,500 1,788 - - - - -
-
kWh
$9,500
1,788
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,080
Cost:
$3,000
$2,160 51,600 $920 176 - - - - $2,160
51,600
kWh
$920
176
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,780
Cost:
$15,000
$4,670 111,160 $3,110 589 - - - - $4,670
111,160
kWh
$3,110
589
kW-months/year
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,390
Cost:
$10,800
$2,330 55,300 $2,060 390 - - - - $2,330
55,300
kWh
$2,060
390
kW-months/year
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$495
Cost:
-
$265 2,380 $230 44 - - - - $265
2,380
kWh
$230
44
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$220,245
Cost:
$242,000
$9,425 220,440 $15,820 2,987 $117,000 - $78,000 - $9,425
220,440
kWh
$15,820
2,987
kW-months/year
$117,000
-
$
$78,000
-
$
TOTAL IMPLEMENTED Savings:
$132,250
Cost:
$179,100
$9,160 218,060 $6,090 1,155 $117,000 - - - $9,160
218,060
kWh
$6,090
1,155
kW-months/year
$117,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Primary Raw Material Primary Product Electricity Usage Electricity Demand Primary Raw Material Primary Product