IAC Assessment: OR0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product Folding handtools, Knives
NAICS 332215 - Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing
SIC 2134 -
Sales $50,000,000-$100,000,000
# of Employees 254
Plant Area (Sq.Ft.) 77,862
Annual Production 1,570,000 Pieces
Production Hrs. Annual 4,916
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,743 3,858,320 kWh $0.05
Electricity Demand $53,116 11,040 kW-months/year $4.81
Electricity Fees $1,381 - $ -
Natural Gas $45,235 6,794 MMBtu $6.66
TOTAL ENERGY COSTS $274,475
RECOMMENDED SAVINGS* $129,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,450
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Energy Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Energy Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8211 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES Savings:
$78,000
Cost:
$44,800
- - - - - - $74,200 - $3,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$74,200
-
$
$3,800
-
$
02: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$32,000
Cost:
$1,500
- - - - $32,000 - - - - - -
-
kWh
-
-
kW-months/year
$32,000
-
MMBtu
-
-
$
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$12,600
Cost:
$5,000
$9,300 206,000 $3,300 672 - - - - - - $9,300
206,000
kWh
$3,300
672
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,850
Cost:
$8,350
$4,140 91,400 $1,710 348 - - - - - - $4,140
91,400
kWh
$1,710
348
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$590
Cost:
-
$390 8,700 $200 40 - - - - - - $390
8,700
kWh
$200
40
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$129,040
Cost:
$59,650
$13,830 306,100 $5,210 1,060 $32,000 - $74,200 - $3,800 - $13,830
306,100
kWh
$5,210
1,060
kW-months/year
$32,000
-
MMBtu
$74,200
-
$
$3,800
-
$
TOTAL IMPLEMENTED Savings:
$18,450
Cost:
$13,350
$13,440 297,400 $5,010 1,020 - - - - - - $13,440
297,400
kWh
$5,010
1,020
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Other Energy Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Energy Personnel Changes Administrative Changes