IAC Assessment: OR0471
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0471
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Dimensional Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 131
Plant Area (Sq.Ft.) 363,000
Annual Production 152,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $891,965 22,441,200 kWh $0.04
Electricity Demand $292,513 56,799 kW-months/year $5.15
Electricity Fees $26,516 - $ -
Wood $1,172,334 500,000 MMBtu $2.34
TOTAL ENERGY COSTS $2,383,328
RECOMMENDED SAVINGS* $642,734 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $114,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Wood Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,840
Cost:
$4,840
$4,100 103,000 $740 12 - - - - - - - - $4,100
103,000
kWh
$740
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$22,560
Cost:
$8,500
$21,350 536,000 $1,210 19 - - - - - - - - $21,350
536,000
kWh
$1,210
19
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$4,600
Cost:
$7,100
$4,600 115,900 - - - - - - - - - - $4,600
115,900
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$58,650
Cost:
$10,000
$58,650 1,473,700 - - - - - - - - - - $58,650
1,473,700
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 4.642 INSTALL SENSORS TO DETECT AND AVOID JAMS Savings:
$102,700
Cost:
$77,400
- - - - - - - - - - $102,700 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$102,700
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$44,000
Cost:
$92,000
$34,000 855,500 $10,000 160 - - - - - - - - $34,000
855,500
kWh
$10,000
160
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,220
Cost:
$20,000
- - - - $18,220 - - - - - - - -
-
kWh
-
-
kW-months/year
$18,220
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,470
Cost:
$9,300
$4,920 125,000 $1,550 25 - - - - - - - - $4,920
125,000
kWh
$1,550
25
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 4.642 INSTALL SENSORS TO DETECT AND AVOID JAMS Savings:
$6,000
Cost:
$1,000
- - - - - - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$6,000
-
$
10: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$251,508
Cost:
$60,000
- - - - - - $251,508 258,062 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$251,508
258,062
MMBtu
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,291
Cost:
$27,750
$15,139 380,370 $3,152 51 - - - - - - - - $15,139
380,370
kWh
$3,152
51
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
12: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$104,895
Cost:
$422,500
$133,720 3,309,600 $24,350 394 - - - - $(-53,175) - - - $133,720
3,309,600
kWh
$24,350
394
kW-months/year
-
-
$
-
-
MMBtu
$(-53,175)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$642,734
Cost:
$740,390
$276,479 6,899,070 $41,002 661 $18,220 - $251,508 258,062 $(-53,175) - $108,700 - $276,479
6,899,070
kWh
$41,002
661
kW-months/year
$18,220
-
$
$251,508
258,062
MMBtu
$(-53,175)
-
$
$108,700
-
$
TOTAL IMPLEMENTED Savings:
$114,941
Cost:
$59,190
$103,839 2,608,970 $5,102 82 - - - - - - $6,000 - $103,839
2,608,970
kWh
$5,102
82
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$6,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Wood Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Wood Ancillary Material Cost Primary Product