IAC logo
IAC Assessment: OR0474
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0474
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Margarine
NAICS 311225 - Fats and Oils Refining and Blending
SIC 2079 - Edible Fats And Oils, Nec
Sales $50,000,000-$100,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 105,000,000 Pounds
Production Hrs. Annual 5,024
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,138 2,468,100 kWh $0.04
Electricity Demand $32,531 6,738 kW-months/year $4.83
Electricity Fees $8,556 - $ -
Natural Gas $82,599 137,722 MMBtu $0.60
TOTAL ENERGY COSTS $228,824
RECOMMENDED SAVINGS* $35,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,097
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$8,887
Cost:
$4,500
- - - - - - $8,887 39,083 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,887
39,083
Tgal
-
-
gal
-
-
$
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$9,900
Cost:
$2,770
- - - - $3,870 7,590 $550 4,675 $610 468,500 $4,870 - -
-
kWh
-
-
kW-months/year
$3,870
7,590
MMBtu
$550
4,675
Tgal
$610
468,500
gal
$4,870
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,700
Cost:
$2,030
- - - - $2,700 5,290 - - - - - - -
-
kWh
-
-
kW-months/year
$2,700
5,290
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,700
Cost:
$5,900
$2,900 73,400 $1,800 28 - - - - - - - - $2,900
73,400
kWh
$1,800
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,910
Cost:
$3,000
$1,890 46,850 $1,020 14 - - - - - - - - $1,890
46,850
kWh
$1,020
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
06: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$6,200
Cost:
$1,500
$6,200 152,400 - - - - - - - - - - $6,200
152,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$35,297
Cost:
$19,700
$10,990 272,650 $2,820 42 $6,570 12,880 $9,437 43,758 $610 468,500 $4,870 - $10,990
272,650
kWh
$2,820
42
kW-months/year
$6,570
12,880
MMBtu
$9,437
43,758
Tgal
$610
468,500
gal
$4,870
-
$
TOTAL IMPLEMENTED Savings:
$29,097
Cost:
$18,200
$4,790 120,250 $2,820 42 $6,570 12,880 $9,437 43,758 $610 468,500 $4,870 - $4,790
120,250
kWh
$2,820
42
kW-months/year
$6,570
12,880
MMBtu
$9,437
43,758
Tgal
$610
468,500
gal
$4,870
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Ancillary Material Cost