IAC logo
IAC Assessment: OR0498
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0498
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2006
Principal Product Laundry Equipment
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3582 - Commercial Laundry Equipment
Sales $1,000,000-$5,000,000
# of Employees 36
Plant Area (Sq.Ft.) 50,000
Annual Production 80 Pieces
Production Hrs. Annual 2,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,433 734,080 kWh $0.06
Electricity Demand $10,254 3,347 kW-months/year $3.06
Electricity Fees $2,861 - $ -
Natural Gas $32,976 3,759 MMBtu $8.77
TOTAL ENERGY COSTS $86,524
RECOMMENDED SAVINGS* $21,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2514 COVER OPEN TANKS Savings:
$7,300
Cost:
$3,600
$7,300 132,000 - - - - - - $7,300
132,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,300
Cost:
-
- - - - $1,300 125 - - -
-
kWh
-
-
kW-months/year
$1,300
125
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,300
Cost:
$2,300
$1,800 32,000 $500 16 - - - - $1,800
32,000
kWh
$500
16
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,450
Cost:
$1,800
$1,250 22,900 $200 6 - - - - $1,250
22,900
kWh
$200
6
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$600
Cost:
$400
- - - - $600 60 - - -
-
kWh
-
-
kW-months/year
$600
60
MMBtu
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,400
Cost:
$20,000
$4,300 78,000 $1,100 34 - - - - $4,300
78,000
kWh
$1,100
34
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,600
Cost:
$17,400
$2,850 51,740 $650 20 - - $100 - $2,850
51,740
kWh
$650
20
kW-months/year
-
-
MMBtu
$100
-
$
TOTAL RECOMMENDED Savings:
$21,950
Cost:
$45,500
$17,500 316,640 $2,450 76 $1,900 185 $100 - $17,500
316,640
kWh
$2,450
76
kW-months/year
$1,900
185
MMBtu
$100
-
$
TOTAL IMPLEMENTED Savings:
$19,200
Cost:
$43,700
$16,250 293,740 $2,250 70 $600 60 $100 - $16,250
293,740
kWh
$2,250
70
kW-months/year
$600
60
MMBtu
$100
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes