IAC logo
IAC Assessment: OR0499
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0499
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2006
Principal Product Bread and Buns
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 230,000
Annual Production 27,903 Tons
Production Hrs. Annual 7,332
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,920 5,696,484 kWh $0.05
Electricity Demand $51,489 10,409 kW-months/year $4.95
Electricity Fees $22,522 - $ -
Natural Gas $371,631 48,897 MMBtu $7.60
TOTAL ENERGY COSTS $781,583
RECOMMENDED SAVINGS* $154,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $151,593
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$77,273
Cost:
$12,000
- - - - - - $77,273 8,682 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$77,273
8,682
MMBtu
-
-
lb
-
-
$
-
-
$
02: 4.125 Savings:
$30,000
Cost:
$18,000
- - - - - - - - - - $(-2,400) - $32,400 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$(-2,400)
-
$
$32,400
-
$
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$5,200
Cost:
-
- - - - - - - - $5,200 36,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$5,200
36,000
lb
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,900
Cost:
$570
- - - - - - $4,900 5,650 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,900
5,650
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,960
Cost:
$3,700
$5,920 107,000 $1,040 17 - - - - - - - - - - $5,920
107,000
kWh
$1,040
17
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,700
Cost:
$12,700
$11,100 201,000 $1,600 26 - - - - - - - - - - $11,100
201,000
kWh
$1,600
26
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,700
Cost:
$5,700
$5,000 90,000 $700 12 - - - - - - - - - - $5,000
90,000
kWh
$700
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,950
Cost:
$4,600
$2,100 38,000 $850 850 - - - - - - - - - - $2,100
38,000
kWh
$850
850
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,400
Cost:
$19,000
$6,400 115,000 - - - - - - - - - - - - $6,400
115,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,460
Cost:
$8,200
- - - - $2,460 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,460
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$154,543
Cost:
$84,470
$30,520 551,000 $4,190 905 $2,460 - $82,173 14,332 $5,200 36,000 $(-2,400) - $32,400 - $30,520
551,000
kWh
$4,190
905
kW-months/year
$2,460
-
$
$82,173
14,332
MMBtu
$5,200
36,000
lb
$(-2,400)
-
$
$32,400
-
$
TOTAL IMPLEMENTED Savings:
$151,593
Cost:
$79,870
$28,420 513,000 $3,340 55 $2,460 - $82,173 14,332 $5,200 36,000 $(-2,400) - $32,400 - $28,420
513,000
kWh
$3,340
55
kW-months/year
$2,460
-
$
$82,173
14,332
MMBtu
$5,200
36,000
lb
$(-2,400)
-
$
$32,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product