Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2007 |
Principal Product | Coated Food Packaging |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2671 - Paper Coated & Laminated, Packaging |
Sales | $50,000,000-$100,000,000 |
# of Employees | 215 |
Plant Area (Sq.Ft.) | 228,600 |
Annual Production | 250,000 Pounds |
Production Hrs. Annual | 8,700 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $851,821 | 16,936,282 | kWh | $0.05 |
Electricity Demand | $79,037 | 29,602 | kW-months/year | $2.67 |
Electricity Fees | $35,590 | - | $ | - |
Natural Gas | $614,541 | 65,095 | MMBtu | $9.44 |
TOTAL ENERGY COSTS | $1,580,989 | |||
RECOMMENDED SAVINGS* | $405,620 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,500 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,300 Cost: - |
- | - | - | - | $1,300 | 1 | - | - |
- - kWh |
- - kW-months/year |
$1,300 1 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $135,120 Cost: $4,350 |
$920 | 18 | - | - | $134,200 | 152 | - | - |
$920 18 kWh |
- - kW-months/year |
$134,200 152 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $3,900 Cost: $500 |
$3,400 | 68,900 | $500 | 31 | - | - | - | - |
$3,400 68,900 kWh |
$500 31 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $4,400 Cost: $1,000 |
$4,400 | 88,600 | - | - | - | - | - | - |
$4,400 88,600 kWh |
- - kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.625 DEVELOP STANDARD OPERATING PROCEDURES |
Savings: $204,000 Cost: $18,800 |
- | - | - | - | - | - | $204,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$204,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $500 Cost: $7,700 |
- | - | $500 | 200 | - | - | - | - |
- - kWh |
$500 200 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $16,800 Cost: $11,500 |
$15,600 | 316,900 | $1,200 | 436 | - | - | - | - |
$15,600 316,900 kWh |
$1,200 436 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $34,700 Cost: - |
$32,000 | 648,800 | $2,700 | 972 | - | - | - | - |
$32,000 648,800 kWh |
$2,700 972 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,900 Cost: $7,400 |
$4,900 | 99,400 | - | - | - | - | - | - |
$4,900 99,400 kWh |
- - kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $405,620 Cost: $51,250 |
$61,220 | 1,222,618 | $4,900 | 1,639 | $135,500 | 153 | $204,000 | - | $61,220 1,222,618 kWh |
$4,900 1,639 kW-months/year |
$135,500 153 MMBtu |
$204,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,500 Cost: $7,700 |
$32,000 | 648,800 | $3,200 | 1,172 | $1,300 | 1 | - | - | $32,000 648,800 kWh |
$3,200 1,172 kW-months/year |
$1,300 1 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production |