IAC Assessment: OR0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2007
Principal Product trusses
NAICS 321214 - Truss Manufacturing
SIC 2439 - Structural Wood Members, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 115,000
Annual Production 70,000,000 Units
Production Hrs. Annual 2,600
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,592 2,156,266 kWh $0.06
Electricity Demand $51,071 9,897 kW-months/year $5.16
Electricity Fees $9,508 - $ -
Natural Gas $26,144 2,101 MMBtu $12.44
TOTAL ENERGY COSTS $208,315
RECOMMENDED SAVINGS* $46,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,400
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.6226 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE Savings:
$5,800
Cost:
-
$5,800 56 - - $5,800
56
kWh
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$18,100
Cost:
$37,100
$18,100 208,000 - - $18,100
208,000
kWh
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,600
Cost:
$15,300
$5,600 95 - - $5,600
95
kWh
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,300
Cost:
$7,800
$5,300 68 - - $5,300
68
kWh
-
-
$
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,400
Cost:
$9,800
$3,400 45 - - $3,400
45
kWh
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,800
Cost:
$13,200
- - $2,800 - -
-
kWh
$2,800
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,300
Cost:
$26,900
$5,300 55 - - $5,300
55
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$46,300
Cost:
$110,100
$43,500 208,319 $2,800 - $43,500
208,319
kWh
$2,800
-
$
TOTAL IMPLEMENTED Savings:
$32,400
Cost:
$70,000
$32,400 208,208 - - $32,400
208,208
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees