IAC Assessment: OR0537
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0537
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2008
Principal Product Particle Board
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 325,930
Annual Production 177,650,000 Units
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $345,202 8,795,223 kWh $0.04
Electricity Demand $51,752 17,619 kW-months/year $2.94
Electricity Fees $10,461 - $ -
Wood $279,933 137,567 MMBtu $2.03
TOTAL ENERGY COSTS $687,348
RECOMMENDED SAVINGS* $431,777 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,113
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes Primary Product Electricity Usage Electricity Demand Wood Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$34,473
Cost:
$24,900
$30,416 774,937 $4,057 115 - - - - - - $30,416
774,937
kWh
$4,057
115
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 4.123 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING Savings:
$56,459
Cost:
$10,000
$(-13,237) 337,260 - - - - - - $69,696 - $(-13,237)
337,260
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$69,696
-
$
03: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$131,635
Cost:
$140,000
$22,640 576,808 $2,328 66 - - - - $106,667 - $22,640
576,808
kWh
$2,328
66
kW-months/year
-
-
MMBtu
-
-
$
$106,667
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,283
Cost:
$27,375
$7,417 189,039 $228 7 - - $2,638 - - - $7,417
189,039
kWh
$228
7
kW-months/year
-
-
MMBtu
$2,638
-
$
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$4,386
Cost:
$18,550
$3,978 101,367 $408 12 - - - - - - $3,978
101,367
kWh
$408
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$3,113
Cost:
-
$2,739 69,808 $374 11 - - - - - - $2,739
69,808
kWh
$374
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$11,928
Cost:
$5,611
- - - - $11,928 5,680 - - - - -
-
kWh
-
-
kW-months/year
$11,928
5,680
MMBtu
-
-
$
-
-
$
08: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$179,500
Cost:
$279,600
- - - - $82,800 9,943 $(-10,000) - $106,700 - -
-
kWh
-
-
kW-months/year
$82,800
9,943
MMBtu
$(-10,000)
-
$
$106,700
-
$
TOTAL RECOMMENDED Savings:
$431,777
Cost:
$506,036
$53,953 2,049,219 $7,395 211 $94,728 15,623 $(-7,362) - $283,063 - $53,953
2,049,219
kWh
$7,395
211
kW-months/year
$94,728
15,623
MMBtu
$(-7,362)
-
$
$283,063
-
$
TOTAL IMPLEMENTED Savings:
$3,113
Cost:
-
$2,739 69,808 $374 11 - - - - - - $2,739
69,808
kWh
$374
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Wood Personnel Changes Primary Product Electricity Usage Electricity Demand Wood Personnel Changes Primary Product