IAC logo
IAC Assessment: OR0547
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0547
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2009
Principal Product Dimensional Lumber, Specialty order Lumber and Beams
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 100,000
Annual Production 20,000 Thousand Feet
Production Hrs. Annual 2,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,750 3,074,720 kWh $0.04
Electricity Demand $72,095 15,943 kW-months/year $4.52
Electricity Fees $29,714 - $ -
Wood $195,000 171,600 MMBtu $1.14
TOTAL ENERGY COSTS $426,559
RECOMMENDED SAVINGS* $167,848 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,108
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$90,740
Cost:
$81,950
- - - - - - $90,740 90,948 -
-
kWh
-
-
kW-months/year
-
-
$
$90,740
90,948
MMBtu
02: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$39,218
Cost:
$44,000
- - - - - - $39,218 12,526 -
-
kWh
-
-
kW-months/year
-
-
$
$39,218
12,526
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$939
Cost:
$1,042
- - - - - - $939 824 -
-
kWh
-
-
kW-months/year
-
-
$
$939
824
MMBtu
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$705
Cost:
-
$705 16,000 - - - - - - $705
16,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,091
Cost:
$5,000
$3,305 75,000 $1,786 33 - - - - $3,305
75,000
kWh
$1,786
33
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$16,829
Cost:
$20,313
$11,943 271,853 $4,886 70 - - - - $11,943
271,853
kWh
$4,886
70
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,257
Cost:
$500
$3,627 85,000 $630 12 - - - - $3,627
85,000
kWh
$630
12
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,090
Cost:
$500
$1,090 22,815 - - - - - - $1,090
22,815
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.8112 COMBINE UTILITY METERS Savings:
$6,709
Cost:
-
- - - - $6,709 - - - -
-
kWh
-
-
kW-months/year
$6,709
-
$
-
-
MMBtu
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,270
Cost:
$15,676
$2,270 33,072 - - - - - - $2,270
33,072
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$167,848
Cost:
$168,981
$22,940 503,740 $7,302 115 $6,709 - $130,897 104,298 $22,940
503,740
kWh
$7,302
115
kW-months/year
$6,709
-
$
$130,897
104,298
MMBtu
TOTAL IMPLEMENTED Savings:
$77,108
Cost:
$87,031
$22,940 503,740 $7,302 115 $6,709 - $40,157 13,350 $22,940
503,740
kWh
$7,302
115
kW-months/year
$6,709
-
$
$40,157
13,350
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood