IAC Assessment: OR0557
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0557
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2010
Principal Product Juice and puree concentrates
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 64
Plant Area (Sq.Ft.) 40,000
Annual Production 66,981,952 Units
Production Hrs. Annual 8,424
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,967 2,580,827 kWh $0.09
Electricity Demand $31,354 6,555 kW-months/year $4.78
Natural Gas $344,823 71,596 MMBtu $4.82
TOTAL ENERGY COSTS $602,144
RECOMMENDED SAVINGS* $55,836 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,806
Cost:
$14,882
- - $15,806 3,659 -
-
kWh
$15,806
3,659
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,866
Cost:
$6,763
$5,866 74,494 - - $5,866
74,494
kWh
-
-
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,416
Cost:
$500
- - $4,416 1,022 -
-
kWh
$4,416
1,022
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,893
Cost:
$3,858
- - $1,893 145 -
-
kWh
$1,893
145
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,655
Cost:
$1,655
$1,655 20,563 - - $1,655
20,563
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,035
Cost:
$3,858
$1,035 8,745 - - $1,035
8,745
kWh
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,471
Cost:
$1,471
$1,471 18,278 - - $1,471
18,278
kWh
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$615
Cost:
$353
- - $615 132 -
-
kWh
$615
132
MMBtu
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$23,079
Cost:
$87,827
$23,079 295,488 - - $23,079
295,488
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$55,836
Cost:
$121,167
$33,106 417,568 $22,730 4,958 $33,106
417,568
kWh
$22,730
4,958
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas