Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2011 |
Principal Product | Dimension Lumber |
NAICS | 321113 - Sawmills |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $10,000,000-$50,000,000 |
# of Employees | 57 |
Plant Area (Sq.Ft.) | 34,380 |
Annual Production | 40,000,000 Units |
Production Hrs. Annual | 3,094 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $123,298 | 3,906,178 | kWh | $0.03 |
Electricity Demand | $50,092 | 15,852 | kW-months/year | $3.16 |
Electricity Fees | $9,192 | - | $ | - |
TOTAL ENERGY COSTS | $182,582 | |||
RECOMMENDED SAVINGS* | $329,269 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,623 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,717 Cost: $1,120 |
$9,902 | 304,200 | - | - | $(-4,625) | (-1,156) | $(-560) | - |
$9,902 304,200 kWh |
- - kW-months/year |
$(-4,625) (-1,156) MMBtu |
$(-560) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $13,809 Cost: $52,890 |
$10,894 | 334,686 | $2,915 | 878 | - | - | - | - |
$10,894 334,686 kWh |
$2,915 878 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,616 Cost: $2,200 |
$2,308 | 70,902 | $1,308 | 394 | - | - | - | - |
$2,308 70,902 kWh |
$1,308 394 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $1,906 Cost: $7,000 |
$1,399 | 42,987 | $507 | 152 | - | - | - | - |
$1,399 42,987 kWh |
$507 152 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $989 Cost: $2,400 |
$989 | 30,394 | - | - | - | - | - | - |
$989 30,394 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,292 Cost: $44,400 |
$10,200 | 313,000 | $257 | 77 | - | - | $4,835 | - |
$10,200 313,000 kWh |
$257 77 kW-months/year |
- - MMBtu |
$4,835 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,940 Cost: $12,340 |
$1,810 | 55,599 | $2,130 | 642 | - | - | - | - |
$1,810 55,599 kWh |
$2,130 642 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $285,000 Cost: $626,000 |
- | - | - | - | - | - | $285,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$285,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $329,269 Cost: $748,350 |
$37,502 | 1,151,768 | $7,117 | 2,143 | $(-4,625) | (-1,156) | $289,275 | - | $37,502 1,151,768 kWh |
$7,117 2,143 kW-months/year |
$(-4,625) (-1,156) MMBtu |
$289,275 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,623 Cost: $106,490 |
$24,801 | 761,575 | $4,987 | 1,501 | - | - | $4,835 | - | $24,801 761,575 kWh |
$4,987 1,501 kW-months/year |
- - MMBtu |
$4,835 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Gas | Ancillary Material Cost |