IAC logo
IAC Assessment: OR0610
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0610
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Freeze Dried Food
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 84,620
Annual Production 3,858 Units
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $778,749 15,424,774 kWh $0.05
Electricity Demand $242,732 30,039 kW-months/year $8.08
Electricity Fees $74,315 - $ -
Natural Gas $192,648 39,253 MMBtu $4.91
TOTAL ENERGY COSTS $1,408,196
RECOMMENDED SAVINGS* $266,611 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,511
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$11,054
Cost:
$11,584
$4,630 87,943 - - $6,424 1,450 - - $4,630
87,943
kWh
-
-
kW-months/year
$6,424
1,450
MMBtu
-
-
$
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$8,287
Cost:
$11,998
$8,287 157,390 - - - - - - $8,287
157,390
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$161,127
Cost:
$238,200
$17,979 341,482 $3,948 468 - - $139,200 - $17,979
341,482
kWh
$3,948
468
kW-months/year
-
-
MMBtu
$139,200
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,406
Cost:
$2,100
$1,406 25,002 - - - - - - $1,406
25,002
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$64,511
Cost:
$85,275
$53,015 1,006,988 $11,496 1,362 - - - - $53,015
1,006,988
kWh
$11,496
1,362
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,077
Cost:
$26,477
$7,307 138,792 $770 91 - - - - $7,307
138,792
kWh
$770
91
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$6,621
Cost:
$24,248
$5,513 98,007 $1,108 131 - - - - $5,513
98,007
kWh
$1,108
131
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$4,383
Cost:
$16,215
- - - - $4,383 989 - - -
-
kWh
-
-
kW-months/year
$4,383
989
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,145
Cost:
$5,840
$1,145 21,748 - - - - - - $1,145
21,748
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$266,611
Cost:
$421,937
$99,282 1,877,352 $17,322 2,052 $10,807 2,439 $139,200 - $99,282
1,877,352
kWh
$17,322
2,052
kW-months/year
$10,807
2,439
MMBtu
$139,200
-
$
TOTAL IMPLEMENTED Savings:
$64,511
Cost:
$85,275
$53,015 1,006,988 $11,496 1,362 - - - - $53,015
1,006,988
kWh
$11,496
1,362
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes