IAC Assessment: OR0613
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0613
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Baked Goods
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 49
Plant Area (Sq.Ft.) 40,000
Annual Production 40,000,000 Pieces
Production Hrs. Annual 8,112
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,481 5,026,238 kWh $0.07
Electricity Demand $65,651 8,856 kW-months/year $7.41
Electricity Fees $33,247 - $ -
Natural Gas $139,559 20,853 MMBtu $6.69
TOTAL ENERGY COSTS $596,938
RECOMMENDED SAVINGS* $36,138 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,099
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$11,140
Cost:
$5,000
$(-10) (-136) - - - - $7,488 192,000 $3,662 - - - $(-10)
(-136)
kWh
-
-
kW-months/year
-
-
MMBtu
$7,488
192,000
lb
$3,662
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,040
Cost:
$2,913
$1,967 26,080 $5 1 - - - - $69 - $999 - $1,967
26,080
kWh
$5
1
kW-months/year
-
-
MMBtu
-
-
lb
$69
-
$
$999
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,262
Cost:
$36,000
$7,886 104,527 $1,283 163 - - - - - - $2,093 - $7,886
104,527
kWh
$1,283
163
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,093
-
$
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$3,635
Cost:
$8,000
- - - - - - $3,948 100 $(-313) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,948
100
lb
$(-313)
-
$
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,364
Cost:
$17,632
- - - - $5,364 902 - - - - - - -
-
kWh
-
-
kW-months/year
$5,364
902
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$991
Cost:
$95
$991 13,140 - - - - - - - - - - $991
13,140
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$706
Cost:
$448
$706 9,355 - - - - - - - - - - $706
9,355
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$36,138
Cost:
$70,088
$11,540 152,966 $1,288 164 $5,364 902 $11,436 192,100 $3,418 - $3,092 - $11,540
152,966
kWh
$1,288
164
kW-months/year
$5,364
902
MMBtu
$11,436
192,100
lb
$3,418
-
$
$3,092
-
$
TOTAL IMPLEMENTED Savings:
$24,099
Cost:
$41,543
$9,573 126,886 $1,283 163 - - $7,488 192,000 $3,662 - $2,093 - $9,573
126,886
kWh
$1,283
163
kW-months/year
-
-
MMBtu
$7,488
192,000
lb
$3,662
-
$
$2,093
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost