Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2013 |
Principal Product | Sulfur |
NAICS | 212393 - Other Chemical and Fertilizer Mineral Mining |
SIC | 1479 - Chemical And Fertilizer Mining, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 10 |
Plant Area (Sq.Ft.) | 287,469 |
Annual Production | 84,000 Units |
Production Hrs. Annual | 4,940 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $49,139 | 667,840 | kWh | $0.07 |
Electricity Demand | $8,706 | 1,750 | kW-months/year | $4.97 |
Electricity Fees | $620 | - | $ | - |
Natural Gas | $79,350 | 12,341 | MMBtu | $6.43 |
Fuel Oil #2 | $8,475 | 346 | MMBtu | $24.49 |
TOTAL ENERGY COSTS | $146,290 | |||
RECOMMENDED SAVINGS* | $12,150 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,765 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $1,962 Cost: $2,256 |
- | - | - | - | $1,962 | 308 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,962 308 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,765 Cost: $65,592 |
$6,542 | 82,318 | $1,190 | 158 | - | - | $203 | - | $1,830 | - |
$6,542 82,318 kWh |
$1,190 158 kW-months/year |
- - MMBtu |
$203 - $ |
$1,830 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $423 Cost: $13,505 |
$423 | 5,714 | - | - | - | - | - | - | - | - |
$423 5,714 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,150 Cost: $81,353 |
$6,965 | 88,032 | $1,190 | 158 | $1,962 | 308 | $203 | - | $1,830 | - | $6,965 88,032 kWh |
$1,190 158 kW-months/year |
$1,962 308 MMBtu |
$203 - $ |
$1,830 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,765 Cost: $65,592 |
$6,542 | 82,318 | $1,190 | 158 | - | - | $203 | - | $1,830 | - | $6,542 82,318 kWh |
$1,190 158 kW-months/year |
- - MMBtu |
$203 - $ |
$1,830 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost |